Controlled Blast Technology for Demolition and Expansive Excavation of Tunnel for Transform ing the Single Track into Double Track under Complicated Conditions |
HU Guo-we i, HAO Si-wang, CHENG W en-bing, ZHANG Jun-bing |
China Railway No.3 Engineering Group Co. Ltd, Taiyuan, Shanxi 030001, China |
|
|
Abstract Research purposes: The controlled blast technology was adopted during construction of tunnel for transforming single track into the double track of Yichang -Wanzhou Railway Line under complicated geological conditions in order to ensure the stability of wall rock and support structure and the construction safety for achieving the good effect of expansive excavation and perfect social and economic benefits.
Research conclusions:(1) The controlled pre -blast technology was used for divisional and partial demolition of the support structure for secondary lining and the controlled weak smooth blast technology was used to the face for expansive excavation with bench and full-face method. By taking a series of technical measures, such as control of the explosive quantities, establishment of a number of the free faces, improvement of the transmission way and application of non -electric millisecond detonator network, the purpose of reducing blasting vibration was reached. (2) The real –time monitoring was conducted to the blasting vibration and it showed the monitored data accorded with the requirements of the process and target control, achieving the good effect. The shallow buried tunnel was constructed successfully in Yichang and Wanzhou areas with broken rocks and karst development, following the subsequence of "first construction single -track tunnel and later construction of double -track tunnel by demolition and expansive excavation blasting".
|
Received: 09 November 2009
|
|
|
|
|
Cite this article: |
HU Guo-we i,HAO Si-wang,CHENG W en-bing, et al. Controlled Blast Technology for Demolition and Expansive Excavation of Tunnel for Transform ing the Single Track into Double Track under Complicated Conditions[J]. 铁道工程学报, 2009, 26(11): 84-88.
|
|
|
|
URL: |
http://tdgcxb.crec.cn/EN/ OR http://tdgcxb.crec.cn/EN/Y2009/V26/I11/84 |
[1] 雷升祥,高波,肖清华.锦屏高地应力下特大异形断面隧洞扩挖技术研究[J].铁道建筑, 2008(9): 13 -15.
[2] 杨年华,张志毅.复杂环境下硐室爆破振动控制的应用研究[J].工程爆破, 2008(1): 21 -24.
[3] 卓国平,聋潭隧道的光面爆破[J].铁道工程学报, 2003(1): 96 -99.
[4] 王晓放,李存德,宋玉香.双跨连拱隧道侧导洞扩挖动力分析[J].石家庄铁道学院学报, 2008(15): 5 -7.
[5] 邓少军,高世军,阳军生.扩挖施工引起的群洞效应分析[J].中国科技信息, 2007(8): 37 -39.
[6] 戴俊,杨永琦.光面爆破相邻炮孔存在起爆时差的炮孔间距计算[J].爆炸与冲击, 2003(3): 253 -258.
[7] 葛春民.小草湖铁路隧道光面爆破设计与施工[J].山西建筑, 2004(11): 129 -130.
[8] 左宇军.钢筋混凝土拆除爆破炮孔装药量的确定[J].工程爆破, 1997(1): 11 -14.
[9] 郑大榕.南京地铁隧道爆破开挖与振动控制[J].铁道工程学报, 2004(3): 73 -75.
[10]戴俊,杨永琦,罗艾民.周边控制爆破度对围岩损伤的分形研究[J].煤炭学报, 2001(3): 265 -269.
|
|
|
|