Practice and Discussion onDesign ofGangchengluVehicleDepot for Shanghai M etro |
YUN Hu |
China Railway FirstSurvey and Design InstituteGroup Ltd., Xia' n, Shanxi 710043, China |
|
|
Abstract Research purposes: The Gangchenglu Vehicle Depot is installed for Line 6 of ShanghaiMetro. With the continuous progress ofdoing research on common sharing resource of the depo,t the depots' function and scale changed several times. Based on the comprehensive consideration of interactive relation between the maintenance and repair resource of the entire transportation network and the Line 6 of ShanghaiMetro, in this paper, the feasibilities of the maintenance and repair resource sharing, function positioning, construction scale and overall arrangementof the depot are discussed and the feasible plan is proposed and determined through optimizing and designing the optional overall plans formaking the overall planmore reasonable.
Research conclusions:From the discussions on the maintenance and repair resource sharing, function positioning,construction scale and overall arrangementof theGangchengDepo,t it is concluded the design of the depot involves lots ofmatters inwide range and ismuch affected by the depotsite, the connection condition of the lines forentering into and departing from the depo,t the line and network plan and the resource sharing. Therefore, the overall analyses should be made in the design and the design scheme should be optimized. The pipelines of the depot should be well designed in overall arrangementbecause there are lots of pipelines for the power feeding, overhead contactwires, signaling and communication andwater supplying and draining for the depo.t The large -sized equipments, such as vehicle washing machine and sprocketmachine, much affect the design and construction of civil engineering due to the long production period for them, so it isnecessary to purchase them in advance. The vehicle lifting jacks and vehicle traverse should be used for the overhau,l and it is good for the coming construction ofother facilities for the overhaul.
|
Received: 05 December 2008
|
|
|
|
|
[1] 上海铁路城市轨道交通设计研究院,上海市城市规划设计研究院.上海城市轨道交通专业规划-车辆段、停车场布局规划[R].上海:上海市城市交通管理局, 2003.
[2] 中铁第一勘察设计院集团有限公司.上海轨道交通6号线工程施工图设计[Z].西安:中铁第一勘察设计院集团有限公司, 2006.
[3] 顾伟华.上海城市轨道交通网络建设与资源共享[J].城市轨道交通研究, 2005(6): 15 -19.
[4] 彭义,等.浅谈城市地铁车辆段总平面布置[J].铁道标准设计, 2001(3): 50 -51.
[5] 刘冰.地铁车辆段与综合基地段型设计初探[J].现代城市轨道交通, 2006(1): 44 -46.
[6] 叶霞飞,顾保南.城市轨道交通规划与设计[M ].北京:中国铁道出版社, 1999.
[7] 仇立新.城市轨道交通系统车辆段有关问题探讨[J].城市轨道交通, 2001(12): 39 -41.
[8] 张雄.李剑虹.论地铁车辆段洗车线布置型式及能力分析[J].铁道工程学报, 2006(6): 75 -79.
[9] 王瑞震.天津轨道线网车辆基地资源共享方案研究[J].铁道工程学报, 2006(7): 81 -83.
[10]张雄.李剑虹.论地铁车辆段洗车线布置型式及能力分析[J].铁道工程学报, 2008(6): 101 -111.
|
|
|
|