Evaluation of the Catenary-pantograph Relation in Passenger Dedicated Line and Its Application in Beijing-Tianjin Intercity Railway |
BAO Li-bo, LUO Jian |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300251, China |
|
|
Abstract Research purposes:Catenary-pantograph relation is one of key points of high-speed electrified railway. By doing the researches on the catenary-pantograph relation requirements and parameter evaluation standard of international high-speed electrified railway and also on the catenary-pantograph relation and static state dynamic examination for Beijing-Tianjin Intercity Railway, this paper systemically summarizes the evaluation standard of catenary-pantograph relation in China, and puts forward the advices for designing pantograph and OCS for high-speed electrified railway based on the examined data of Beijing-Tianjin Intercity Railway.
Research conclusions:The research and analysis of the requirements of catenary-pantograph relation as well as the examined data show the evaluation standard used for the catenary-pantograph relation of Beijing-Tianjin Intercity Railway is feasible, which can be as the technical reference to the OCS design simulation platform and the standard engineering evaluation system in China. The proposals are made that for reducing the off-wire spark of high-speed electrified railway, the pantograph design should be optimized and the tension of contact wire should increase to 30kN, and for reducing the elasticity difference of contact wire, the dropper length should be calculated precisely and the installation error should be controlled strictly during construction.
|
Received: 19 January 2009
|
|
|
|
|
[ 1 ] 于万聚. 高速电气化铁路接触网[M]. 成都: 西南交通大学出版社, 2002.
[ 2 ] 基布岭[德], 等. 电气化铁道接触网[M]. 中铁电气化局集团有限公司, 译. 北京: 中国电力出版社, 2003.
[ 3 ] 北京铁路局, 中国铁道科学研究院. 京津城际铁路牵引供电系统联调联试[Z]. 北京: 中国铁道科学研究院,2008.
[ 4 ] 刘莉蓉, 潘英. 200km/h电气化铁路接触网新型零部件与弓网受流质量探讨[J]. 铁道工程学报, 2006(7): 19-24.
[ 5 ] 程德勤, 刘洋. 接触网工程计算系统的研制开发[J]. 铁道工程学报, 2005(5): 32-36.
|
|
|
|