Quality Control Technology and Measure for Double—slab Ballastless Track |
ZHAO Dong—tian |
Yichang—Wanzhou Railway Construction Headquarter,MOR,Enshi,Hubei 445000,China |
|
|
Abstract Research purposes: The ballastless track is the preferred track structure for high—speed railway.In order to make the double—slab ballastless track meeting the requirements of 3 D positioning,high track regularity and less maintenance,the quality control technology and measure in three construction phases for double—slab ballastless track are offered based on the researches on the chosen construction program for the purpose of meeting the accurate demand of the track.
Research conclusions: It is concluded from the research the key points of quality control for double—slab ballstless track can be seized through choice of the construction programs,and the construction procedure and technique can be improved by analyses of the data of the technique tests and the other tests done before the construction.Upon it the engineers can fully master the quality control technology and measure for double—slab ballastless track for improving the construction quality and track accuracy.
|
Received: 14 January 2009
|
|
|
|
|
[1] 卢祖文.树立全新建设理念建设一流客运专线[J].铁 道工程学报, 2005(1): 1 -9.
[2] 何华武.无碴轨道技术[M ].北京:中国铁道出版社, 2005.
[3] 金守华.系统理解客运专线标准体系树立全新铁路建设 理念[J].铁道建筑技术, 2005(2): 1 -4.
[4] YJGF 24)2002,桥上长枕埋入式无碴轨道施工工法 [S].
[5] 赵东田.温福铁路八仙仑双线隧道无砟轨道施工技术 [J].铁道建筑技术, 2008(5): 31 -41.
[6] 王其昌.高速铁路土木工程[M ].成都:西南交通大学出 版社, 1999.
[7] 赵东田,王铁成,刘学毅,等.板式轨道CA砂桨的配制和 性能研究[J].天津大学学报(自然科学版), 2008(8): 22 -28.
|
|
|
|