|
|
Analysis of the Particularity of Calculating Carrying Capacity of Datong-Qinhuangdao Railway |
NIU Hui—xiang |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 30025 1,China |
|
|
Abstract Research purposes: Generally,some influence factors can not be fully reflected in the calculation formula of carrying capacity,such as the time and modes of the comprehensive window maintenance,and the influence of quantity of arrival and departure track in intermediate station on the transport organization and carrying capacity,etc.This paper analyzes the influence factors on Datong—Qinhuangdao Railway,and puts forward a new calculation method for the carrying capacity of Datong—Qinhuangdao railway for being as the valuable reference to survey and design of heavy—haul railway.
Research conclusions: The particularity of calculating carrying capacity of Datong—Qinhuangdao Railway mainly reflects in the following three aspects:(1)There are two kinds of comprehensive window arrangement,namely V—mode and vertical skylight and they occupy the different time of train diagrams.(2)The quantity of arrival and departure track in intermediate station will directly influence the loss window time outside maintenance.(3)The number of V—mode and vertical skylight will influence the daily carrying capacity of the railway.
|
Received: 02 July 2009
|
|
|
|
|
[1]铁道部.铁路区间通过能力计算办法[M].北京:中国铁 道出版社,1984.
[2] 中国铁道科学研究院.大秦铁路2亿吨扩能方案的研究 [R].北京:中国铁道科学研究院,2003.
[3]铁道第t勘察设计院,等.大秦铁路4亿吨可行性研究 报告[R J.天津:铁道第二勘察设计院,2006.
[4] 王海志,田长海,牛会想.大秦线进一步扩能的探讨[J]. 铁道运输与经济,2006(8):44—46.
[5] 田长海,魏瑜,向泽伟,等.大秦线2亿吨运输能力若干 问题的探讨[J].中国铁道科学,2004(1):115—119.
|
|
|
|