Analyses of the Sensitivity of Surrounding Rock Parameters to the Convergence of Measuring Line during Construction |
DU Yu-dong |
Beijing General Municipal Engineering Design and Research Institute, Beijing 100082, China |
|
|
Abstract Research purposes:The construction period of underground engineering is the worst time in safety . In order to ensure the structure safety, choosing the appropriate reinforcement method for the surrounding rock is one of issues paid attention by the engineers. So the sensitivity of the surrounding rock parameters is the key point to the structure safety. With the ANSYS program and theoretical simulation of Monte-carlo random finite element, the excavation processes with advanced releasing multi-layer coupling stress method and layer reversed excavation method are calculated to the large sectional underground cavity of Hainan Project. During the excavation, the statistic analyses are made to every arrangement of the measuring lines and the convergence of the measuring line, the comparisons are made to the influence of surrounding rock parameters on the convergence of every measuring line, and through comparison of the sensitivity of very measuring line to the surrounding rock parameters, the key factors in fluencing the convergence of the underg round cavity are summarized.
Research conclusions:The rock soil parameters influencing the convergence of the verticalm easuring line in order from big to small are deformation modulus, the poisson's ratio, the internal friction and the cohesive strength, but for the horizontal measuring lines are the poissons' ratio, the modulus, the internal friction and the cohesive strength.
|
Received: 14 July 2009
|
|
|
|
|
[ 1 ] 徐钟济. 蒙特卡罗方法[M]. 上海:上海科学技术出版社, 1985.
Xu Zhongji. Monte Carlo Method[M]. Shanghai: Shanghai Sicentific and Technology Press, 1985.
[ 2 ] 陈虬, 刘先斌. 随机有限元法及工程应用[M]. 成都:西南交通大学出版社, 1993.
Chen Qiu, Liu Xianbin. Random Finite Method and Engineering Application[M]. Chengdu: Southwest Jiaotong University Press, 1993.
[ 3 ] 余建星. 船舶与海洋结构物可靠性原理[M]. 天津:天津大学出版社, 2001.
Yu Jianxing. Reliability Principle of the Ship and Offshore Structure[M]. Tianjin: Tianjin University Press, 2001.
[ 4 ] GB 50287 99, 水利水电工程地质堪察规范[S].
GB 50287 99, Code for Water Resources and Hydropower Engineering Geological Investigation[S].
[ 5 ] GB 50218 94, 工程岩体分级标准[S].
GB 50218 94, Standard for Classification of Rock Mass[S].
[ 6 ] 杨林德, 丁文其. 新奥法施工与复合支护的计算[J]. 岩石力学与工程学报, 1998(增刊):840-845.
Yang Linde , Ding Wenqi. NATM Construction and the Calculation of Composite Lining[J]. Chinese Journal of Rock Mechanics and Engineering, 1998 (Supplement):840-845.
[ 7 ] 李术才, 朱维申, 张玉军. 裂隙岩体大型洞室施工顺序优化研究[J]. 岩土工程学报, 1998(1):1-4.
Li Shucai, Zhu Weishen, Zhang Yujun. Research on Construction Sequence Optimization for a Group of Caves in Joined Rock Mass[J]. Journal of Rock and Soil Engineering, 1998(1):1-4.
[ 8 ] 朱维申, 张玉军, 任伟中. 系统锚杆对三峡船闸高边坡岩体加固作用的块体相似模型试验研究[J]. 岩土力学,1996(2):1-6.
Zhu Weishen, Zhang Yujun, Ren Weizhong. Similar Model Block Tests for Reinforcing Effects of Systematic Bolts on Rock Mass of High Slope of Three Gorges Flight Lock[J]. Rock and Soil Mechanics, 1996(2):1-6.
[ 9 ] 景诗庭, 朱永全, 宋玉香 . 隧道结构可靠度 [M ] . 北京: 中国铁道出版社, 2002.
Jing Shiting, Zhu Yongquan, Song Yuxiang. Reliability of Tunnel Structure[M]. Beijing: China Railway Press, 2002.
|
|
|
|