Discussion on Comprehensive Geological Exploration for Basalt Tunnel |
LI Jian,YANG Ying |
China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 61003 1,China |
|
|
Abstract Research purposes: In order to evaluate the general engineering geological condition,forecast geological disaster in tunnel construction and instruct the tunnel construction,the study Was done on the comprehensive geological exploration technology,especially on the comprehensive geophysical exploration technology for the Hehoshan Tunnel of Dali—Ruili Railway according to the special engineering geological characteristics of basalt like differential weathering.
Research conclusions: (1)Based on the data of geophysical exploration,the anomaly of the lower resistivity can be sorted according to the anomaly shape and the value and the gradient of resistivity.(2)The V,IV andⅢanomaly gradations should correspond respectively with the V,IV and III surrounding rocks.On the other hand,the data of the tunnel excavation demonstrate that only with the data of the geophysical exploration it is difficult to distinguish V surrounding rock and IV surrounding rock.(3)Due to special engineering geological character of basalt,the comprehensive geological exploration,especially the geophysical exploration must be conducted in order to objectively evaluate the general engineering geological condition for the tunnel and rightly instruct tunnel construction.
|
Received: 23 July 2010
|
|
|
|
|
[1] 薛新华.基于[1]TB 10012—2001,铁路工程地质勘察规范[S].
TB 10012--2001,Code for Geology Investigation of Railway Engineering[S].
[2]J 124—2001,铁路工程地质勘察规范[S].
J 124--2001,Code for Geology Investigation of Railway Engineering[S].
[3]TB 10038--2001,铁路工程特殊岩土勘察规程[s].
TB 10038--2001,Code for Special Soft and Rock Investigation of Railway Engineering[S].
[4]J 126—2001,铁路工程特殊岩土勘察规程[S].
J126—2001.Code for Special Soil and Rock Investigation of Railway Engineering[S].
[5]TB 10013--2004,铁路工程物理勘探规程[S].
TB 10013--2004,Code for Geophysical Prospecting of Railway Engineering[S].
[6]J 340--2004,铁路工程物理勘探规程[S].
J 340--2004,Code for Geophysical Prospecting of Railway Engineering[S].
[7] 铁建设[2008]105号,铁路隧道超前地质预报技术指南 [s].
Railway Construction[2008]No.105,Guide for Geological Prediction in Tunnel of Railway[S].
[8]TB 10003--2005,J449—2005,铁路隧道设计规范[s].
TB 10003—2005,J449--2005,Code for Design on Tunnel of Railway[S].
[9] 杨英.大丽铁路碎裂玄武岩夹凝灰岩型隧道特征及施工 对策[J].铁道工程学报,2007(12):65—66.
Yang Ying.The Fractured Tuff in Basalt Tunnel Characteristics and the Constuction Countermeasures along Dali—Lijiang Railway[J].Journal of Railway Engineering Society,2007(12):65-66.
[10]底青云,王若.可控源音频大地电磁数据正反演及方法应 用[M].北京:科学出版社,2008.
Di Qingyun,Wang Ruo.Controlled Source Auodio— freqency MagnetoTellurics[M].Beijing:Scientific Publications Inc.,2008.
|
|
|
|