Analysis of Adaptability of Slurry Shield for Construction of River—crossing Tunnel |
ZHOU Ying1,DING Lie—yun1,ZHOU Cheng1,ZHONG Hua2 |
1.Huazhong University of Science&Technology,Wuhan,Hubei 430074,China;2.Nottingham Trent University,UK |
|
|
Abstract Research purposes: The type selection of shield machine is a key element for the shield construction and the shield adaptability is crucial to the construction cost,the construction schedule and the construction safety.Combined with the construction of river—crossing tunnel of Line 2 of Wuhan metro,this paper analyzes the adaptability of slurry shield tunnel and offers the the corresponding control measures.
Research conclusions:Based on the systematic engineering concept of the adaptability between man and the shield tunneling and the construction environment,the analysis is made for the basic concept and intension of the shield adaptability to the construction environment.According to the characteristics of the construction environment,such as The high hydraulic pressure,the shallow covering and the compound stratum etc,the control measures such as setting and adjusting appropriate face pressure,control of shield tunneling attitude,matching the grouting volume and speed with the shield speed are offered to reduce and control the construction risks,such as destabilization of excavation surface,mud pumping in the river bottom,block of the pumping mouth,mud leaking at the shield end and tunnel floating.This can provide the reference to the similar projects.
|
Received: 30 September 2010
|
|
|
|
|
[1] 徐前卫.盾构施工参数的地层适应性模型试验及其理论 研究[D].上海:同济大学,2006:9—12.
Xu Qianwei.Study on the Simulated Model Test of Shield Machine’S Working Parameters Applicable to Different Stratums and Its Theoretical Investigation [D].Shanghai:Tongji University,2006:9—12.
[2] A.G.Benardos,D.C.Kaliampakos.A methodology for assessing geotechnical hazards for TBM tunnening— illustrated by the Athens Metro,Greece[J].International Journal of Rock Mechanics&Mining Sciences.2004 (41):987—999.
[3]Eun—Soo Hong,In—Mo Lee,Hee—Soon Shin. Quantitative risk evaluation based on event tree analysis technique:Application to the design of shield TBM[J]. Tunnelling and Underground Space Technology,2009 (24):269—277.
[4] 周诚.地铁工程建设安全控制系统设计与应用研究[D]. 武汉:华中科技大学,2007:1一5.
Zhou Cheng.Study on the Design and Application for Safety Control System in Metro Construction Project [D].Wuhun:Huazhong University of Science & Technology.2007:1一5.
[5] 袁大军,尹凡,王华伟,等.超大直径泥水盾构掘进对土体 的扰动研究[J].岩石力学与工程学报,2009(10):2074— 2077.
Yuan Dajun,Yin Fan,Wang Huawei,etc.Study of Soil Disturbance Caused by Super—large Diameter Slurry Shield Ttunnelling[J].Chinese Journal of Rock Mechanics and Engineering,2009(10):2074-2077.
[6]Kwangho You,Yeonjun Park,Jun S.Lee.Risk analysis for determination of a tunnel support pattern [J].Tunnelling and Underground Space Technology. 2005(20):479-486.
[7]马可栓,丁烈云,李国成,等.武汉越江隧道近邻管线性状 的有限元分析[J].华中科技大学学报(城市科学版), 2008(1):42—45.
Ma Keshuan,Ding Lieyun,Li Guocheng,etc.Three— dimensional Finite element Analysis on Characters of Pipelines Surrounding Some Open Cut Part of the River—- crossing Highway Tunnel of Wuhan[J].Journal of Hust.(Urban Science Edition),2008(1):42—45.
[8] 李国成,丁烈云.武汉长江隧道盾构施工引起的地表沉降 预测[J].铁道工程学报,2008(5):59—62.
Li Guocheng,Ding Lieyun.Ground SeUlement Induced by Shield Construction of Wuhan Yangtze River Tunnel [J].Journal of Railway Engineering Society,2008(5): 59—62.
|
|
|
|