Measurement in Metro Construction with Subsurface Excavation Method and Feedback Technology |
SONG Yi-rong1, CHEN Guang-feng2, XIA Shi-long3, LI Li-xia3, ZHAO Rong4 |
1.Qinghai University, Xining, Qinghai 810016, China; 2. Tsinghua University, Beijing 100084, China; 3. China Railway Construction Engineering Group, Beijing 100070, China; 4. Beijing University of Civil Engineering and Architecture, Beijing 100044, China |
|
|
Abstract Research purposes:In metro construction, using the reliable monitoring and information feedback technologies can prevent the appearance of accidents. Application of the triangle surveying in shaft can connect the ground with the underground. To strengthen monitoring the deformation, convergence, the vault settlement and ground settlement along with sorting out the monitored data, mapping the displacement-time change curves in time and making regression analysis of the state curves in early stage can predict the important parameters that probably appear, such as the max. deformation value and max. stress value so as to provide the important basis for controlling the risk in advance to the metro construction with subsurface excavation method.
Research conclusions:Application of engineering measurement technology and information feedback technology can know the deformation situation of the monitored objects and therefore can make prediction and adjust the design and construction parameters in time for providing the accurate data to the metro construction and the reference to the similar works.
|
Received: 12 March 2009
|
|
|
|
|
[ 1 ] GB 50308—1999,地下铁道、轻轨交通工程测量规范[S].
GB 50308—1999, Subway, Light Rail Traffic Engineering Measurement Standards[S].
[ 2 ] CJJ 8—99,城市测量规范[S].
CJJ 8—99,Cities Measurement Specifications[S].
[ 3 ] TB 10101—99,新建铁路工程测量技术规范[S].
TB 10101—99, New Railway Engineering Survey Technical Specifications[S].
[ 4 ] GB 50026—93,工程测量规范[S].
GB 50026—93,Engineering Survey Specifications[S].
[ 5 ] JGJ/T 8—97,建筑变形测量规范[S].
JGJ/T 8—97, Architectural Deformation Measurement Standards[S].
[ 6 ] GH 2001—91,全球定位系统(GPS)测量规范[S].
GH 2001—91, Global Positioning System (GPS) Measurement Specifications[S].
[ 7 ] GB /T 15314—94,精密工程测量规范[S].
GB /T 15314—94, Precision Engineering Measurement Standards[S].
[ 8 ] 刘招伟,赵运臣.城市地下工程施工监测与信息反馈技术[M]. 北京:科学出版社, 2006.
Liu Zhaowei, Zhao Yunchen. Urban Underground Construction Monitoring and Feedback Technology[M]. Beijing: Science Press, 2006.
[ 9 ] 胡伍生,潘庆林.土木工程测量[M]. 南京:东南大学出版社, 1999.
Hu Wusheng, Pan Qinglin. Civil Engineering Measurement[M]. Nanjing: Southeast University Press, 1999.
[ 10 ] 郑德华.城市地下工程精密定向导向技术的研究[D]. 南京:河海大学, 1998.
Zheng Dehua. Urban Underground Engineering Precision Directional-oriented Research[D]. Nanjing: Hehai University, 1998.
[ 11 ] 王铁生,翟继红.地铁隧道竖井联系测量与精度分析[J]. 铁道建筑, 2005(5): 44 -46.
Wang Tiesheng, Zhai Jihong. Subway Tunnel Shaft Contact Measurement and Accuracy Analysis[J]. Railway Construction, 2005(5): 44 -46.
[ 12 ]高德龙.“浅埋暗挖”技术在北京地铁建设中的应用[J]. 施工技术, 2000(2): 54 -56.
Gao Delong. "Shallow" Technology in the Construction of Beijing Subway[J]. Construction Technology, 2000(2): 54 -56.
[ 13 ] 胡国伟,程文斌,张宇宁.浅埋暗挖超大跨地铁车站施工控制技术[J]. 隧道施工技术, 2007(11): 138 -141.
Hu Guowei, Cheng Wenbing, Zhang Yuning. Large Shallow Cross Subway Station Construction Control Technology[J]. Tunneling Construction Technique, 2007(11): 138 -141.
[ 14 ] 郑保才,程文斌,胡国伟.浅埋暗挖法施工近接交叉地铁隧道地表沉降监测分析[J]. 铁道工程学报,2009(1):72 -76.
Zheng Baocai, Cheng Wenbing, Hu Guowei. Analysis and Monitoring of Ground Subsidence Caused by Excavation of Adjacent and Crossing Metro Tunnel with Shallow-depth and Subsurface Excavation Method[J]. Journal of Railway Engineering Society, 2009(1):72 -76.
|
|
|
|