Experimental Study on Improvement of Filling Material for Subgrade of Harbin-Dalian Passenger Dedicated Line |
WANG Xiao-ming |
China Railway 13th Bureau Group Corporation, Changchun, Jilin 130033, China |
|
|
Abstract Research purposes:Generally speaking, high-speed railway is very long and its space span is big, so the shortage of the filling materials for the subgrade often does exist in some sections. In order to reduce the construction cost and protect the environment, it is necessary to improve the subgrade filling materials that can not meet the graded requirement in the course of the construction. This research tries to improve the gradation of river pebble with mixing fine-grained soil and fly ash to make the river pebble becoming the qualified subgrade filling material.
Research conclusions:In order to study the feasibility of this method, a lot of tests were done to the tests ample, such as gradation test, compaction stroke test and in-site compacting test. In addition, the different compaction methods were used to the in-site compacting test for seeking a scientific and reasonable compaction technique. The tested result of technique showed this improvement method improved the grained gradation of filling material and enhanced the effective strength and compactness, which could meet the requirement of the code for the filling material. This method not only brought about obvious economic profits, but also brought out the huge social and environment-protective profits.
|
Received: 17 September 2009
|
|
|
|
|
[ 1 ] Sezer, inan G, Y ilmaz H R, et al. Utilization of a very high lime fly ash for improvement of Izmir clay[J]. Building and Environment, 2006(4):150-155.
[ 2 ] 庄心善,王功勋,等.粉煤灰炉渣加固土的室内无侧限抗压强度试验研究[J].岩土工程学报, 2005(8): 965 -969.
Zhuang Xinshan, Wang Gongxun, etc. Experimental Study on Unconfined Compressive Strength of Clays Stabilized with Fly Ash and Slag[J]. Chinese Journal of Geotechnical Engineering, 2005(8): 965 -969.
[ 3 ] 铁建设[2007]47号,新建时速300~350公里客运专线铁路设计暂行规定[S].
Railway Construction [2007] No.47. The Temporary Code of Design of Newly Building 300-350 km/h Passenger Dedicated Railway[S].
[ 4 ] JTGE 40—2007,公路土工试验规程[S].
JTGE 40—2007, Geotechnical Test Code of Highway[S].
[ 5 ] 刘丽萍,折学森.土石混合料压实特性试验研究[J]. 岩石力学与工程学报, 2006(1): 206 -209.
Liu Liping, She Xuesen. Study on Compaction Property of Earth-rock Mixture[J]. Chinese Journal of Rock Mechanics and Engineering, 2006(1): 206 -209.
[ 6 ] 陈花林.石灰改良泥质粉砂岩路基填料的实验研究[J]. 铁道工程学报, 2008(3): 10 -14.
Chen Hualin. Experimental Research on the Improving Filling Materials with Lime for Argillaceous Sandstone Subgrade[J]. Journal of Railway Engineering Society, 2008(3): 10 -14.
[ 7 ] 赵久柄.西宝高速公路粗粒土路基压实度的试验研究[J]. 国外公路, 1996(6): 18 -29.
Zhao Jiubing. Experimental Research on the Compaction Degree of Subgrade of Xibao Highway[J]. Highway Abroad, 1996(6): 18 -29.
[ 8 ] 李波,王万德.土石混合填料压实特性研究[J]. 辽宁省交通高等专科学校学报, 2003(3): 4 -69.
Li Bo, Wang Wande. Research on the Dust and Rock Mix Filling Intimidate Fact Characteristic[J]. Journal of Liaoning Provincial College of Communications, 2003(3): 4 -69.
[ 9 ] 许国平,周全能,胡一峰.砾石土作为客运专线路基填料的可行性分析[J].铁道工程学报, 2008(3): 6 -9.
Xu Guoping, Zhou Quanneng, Hu Yifeng. Analyses of Adaptability of Using GravelSoilas Filling Materials for Subgrade of Passenger Dedicated Railway[J]. Journal of Railway Engineering Society, 2008(3): 16 -9.
[ 10 ]张军丽.论土压实系数的不确定特征[J]. 西安公路交通大学学报, 1998(4): 241 -244.
Zhang Junli. Analysis about Drawbacks of Compacting Factor[J]. Journal of Xi’an Highway University, 1998(4): 241 -244.
|
|
|
|