Discussion on Schemes for Monitoring Post-construction Subsidence of Subgrade of Zhengzhou-Xi'an Passenger Dedicated Line |
HAO Jin-yu, ZHU Shao-jie |
Zhengzhou Railway Administration, Zhengzhou, Henan 450052, China |
|
|
Abstract Research purposes:According to the special requirements of monitoring the post-construction subsidence of the subgrade of Zhengzhou-Xi'an Passenger Dedicated Line in moist loess area, the analysis of the defects of the existing two schemes for monitoring post-construction subsidence is made. Based on the technology development and research of fibre light grid transducer and its monitoring application in civil engineering, the discussion is made on the possibility of using the fibre light grid transducer to monitor the post-construction subsidence of the subgrade of the passenger dedicated line in moist loess area.
Research conclusions:From the analysis and discussion it is concluded the fibre light grid transducer can realize long-distance (50m), quasi-distributed, multi-spots and multi-parameter measurement with the high measurement accuracy. It can accurately measure the vertical displacement change of less than 0.1mm (relative to the reference base), and it is suitable for long-term monitoring with the good capacity of electromagnetic interference resistance and can satisfy the requirement of long-term monitoring the post-construction subsidence of subgrade of Zhengzhou-Xi'an Passenger Dedicated Line in moist loess area.
|
Received: 22 January 2010
|
|
|
|
|
[ 1 ] 铁建设[2006 ]158号,客运专线铁路无碴轨道铺设条件评估技术指南[S].
Railway Construction [2006]No.158, Technical Guidance for Evaluation of Condition of Laying Ballastess Track of Passenger Dedicated Line[S].
[ 2 ] 铁建设[2007]47号, 新建时速300~350公里客运专线铁路设计暂行规定[S].
Railway Construction [2007] No.47, Temporary Regulation for Design of 300-350 km/h Passenger Dedicated Line [S].
[ 3 ] 王文科.徕卡自动变形监测系统在香港九龙铁路中的成功应用[J].测绘通报, 2006(4): 72 -73.
Wang Wenke. Application of Leica Automatic Deformation Monitoring System in Kowloon Railway of Hongkong[J]. Bulletin of Surveying and Mapping, 2006(4) : 72-73.
[ 4 ] 柴敬,魏世明,常心坦,等.岩梁变形监测的分布式光纤传感技术[J].岩石力学与工程学报, 2004(12): 4068 -4071.
Chai Jing,Wei Shiming,Chang Xintan, etc. Distributed Optical Fiber Sensor for Monitoring Rock Deformation[J]. Chinese Journal of Rock Mechanics and Engineering, 2004(12): 4068 -4071.
[ 5 ] Berthold John W. Historical review of microbend fiber optic sensor[J]. Journal of Light wave Technology, 1995 (7): 1 193 -1 199
[ 6 ] 杨林浩.郑西客运专线路基工程沉降观测方案[J]. 铁道工程学报, 2006 (4): 10 -13.
Yang Linhao. Procedure for Observation of Subgrade Settlement of Zhengzhou -Xi'an Passenger Dedicated Railway Line[J]. Journal of Railway Engineering Society, 2006 (4): 10 -13.
[ 7 ] Liu Jinxuan, Chai Jing, Zhu Lei, etc. Theory of Fiber Bragg G rating Multi-point Sensing of Rock Deformation and Its Engineering Application[J]. Acta Optica Sinica, 2008(11): 2143 -2147.
[ 8 ] 郑西铁路客运专线有限责任公司.郑西铁路客运专线沉降观测方案[R].郑州:郑西铁路客运专线有限责任公司, 2005.
Zhengzhou-Xi'an Passenger Dedicated Line Co. Ltd. Scheme for Monitoring the Subsidence of Zhengzhou-Xi'an Passenger Dedicated Line[R]. Zhengzhou: Zhengzhou-Xi'an Passenger Dedicated Line Co. Ltd,2005.
[ 9 ] 冯震,祝海涛,熊仲华.泊松模型预测路基沉降[J]. 华东地质学院学报, 2003(4): 364 -366.
Feng Zhen, Zhu Haitao, Xiong Zhonghua. Forecasting Embankment Settlement With Poission Model[J]. Journal of East China Geological Nstitute,2003(4):364-366.
[ 10 ]余潜.基于实测沉降数据的路基沉降机理及其预测分析[J]. 铁道标准设计, 2007(5): 8 -10
Yu Qian. Settlement Mechanism of Foundation Based on Settlement Data from Practical Measurement as well as Analysis on Settlement Forecasting[J]. Railway Standard Design, 2007(5): 8 -10.
[ 11 ]刘长礼.灰色系统理论在预测地基变形中的应用[J]. 工程勘察, 1992(1): 17 -20.
Liu Changli. Application of Gray System Theory in Monitoring Foundation Deformation[J]. Geotechnical Investigation and Surveying, 1992(1): 17-20.
|
|
|
|