Research on the Management of Supervision in BT Mode for Line 5 of Shenzhen Metro |
DAI He-gen |
China Railway Group Limited, Beijing 100039, China |
|
|
Abstract Research purposes:The BT construction mode is regarded by the governments in China. With more and more practices of it in recent years, some new features of it appear continuously, so it is urgent to do the research on how to give full play to the supervision effect in BT construction mode. The research on the management of supervision in BT mode has the guidance effect and real meaning to the construction project with BT mode.
Research conclusions:In this paper, it is proposed the BT undertaker substitutes for the owner to manage the supervision unit for further bringing into the better balance relations among the BT undertaker, owner and supervision unit, solving the problem of supervisions' deficiency and giving full play to the supervision. It is also proposed that the check-up system to the supervision unit by the BT undertaker, the communication system between the BT undertaker and supervision unit, the regular meeting system between BT undertaker and supervision unit, special examination system and inspiring system should be setup for improving the management system for supervision, giving full play to the supervision and enhancing the construction level of BT project.
|
Received: 25 February 2010
|
|
|
|
|
[ 1 ] 刘林昌,郑树成.北京地铁5号线轨道工程施工监理质量控制措施[J]. 铁道标准设计, 2007(10): 7 -9.
Liu Linchang, Zheng Shucheng. Control Measures for Quality of Construction Inspection and Control in Track Project of Beijing Metro 5# Line[J]. Railway Standard Design, 2007 (10 ): 7 -9.
[ 2 ] 谢建新,郑树成.地铁监理在施工阶段的投资控制要点[J]. 铁道标准设计, 2008(7): 8 -10.
Xie Jianxin, Zheng Shucheng. Investment Control Measure of Subway Construction Inspection[J]. Railway Standard Design, 2008 (7 ): 8 -10.
[3] 建监[1995]737号,工程建设监理规定[S].
Construction Inspection [1995] No.737, Code of Construction Inspection[S].
|
|
|
|