|
|
Main Problems in Engineering Geology and Alignment in Dali-Baoshan Section of Dali-Ruili Railway |
DU Yu-ben, JIANG Liang-wen |
China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes:The Dali-Ruili railway under construction lies in the Hengduanshan area where the Nu River, Lancang River and Jinsha River flow with extremely complicated terrain and geological conditions . This paper summarizes the alignment technology for the Dali-Baoshan section of Dali-Ruili Railway in Hengduanshan area for providing the reference to the similar railway construction in terra in and engineering geological conditions, such as Yunnan-Tibet Railway and Sichuan-Tibet Railway, etc, planned in national railway network.
Research conclusions:The Dali-Baoshan section of Dali-Ruili Railway is nearby the colliding suture zone o f the Indian plate with the Eurasian Plate. As the terrain and geological conditions in this area are extremely complicated, the railway track is much affected by the geological disasters, such as active fault, seismic hazards, collapse , landslides, debris flow and high-temperature hot water. Based on learning the experiences o f alignment in the southwest mountainous area with vale cut sharp and active fault, the technical principles of alignment in Dali-Baoshan section are presented, and the north route scheme with better geological conditions is selected with the railway crossing the Lancang River through the Jihongqiao Bridge.
|
Received: 01 June 2009
|
|
|
|
|
[ 1 ] 张倬元, 王士天, 王兰生. 工程地质分析原理[M]. 北京: 地质出版社, 1993.
Zhang Zhuoyuan, Wang Shitian, Wang Lansheng. Analysis Principles of Engineering Geology[M]. Beijing: Geological Publishing House, 1993 .
[ 2 ] 何振宁. 区域工程地质与铁路选线[M]. 北京: 中国铁道出版社, 2004.
He Zhenning. Regional Engineering Geology and Geological Selection of Route [M]. Beijing: China Railway Publishing House, 2004.
[ 3 ] 楚涌池, 等. 铁路工程地质手册[K]. 北京: 中国铁道出版社, 1999.
Chu Yongchi, et al. Railway Engineering Geology Handbook[K]. Beijing: China Railway Publishing House, 1999 .
[ 4 ] 韩毅, 李隽蓬 . 铁路工程地质[M]. 北京: 中国铁道出版社, 1988.
Han Yi, Li Juanpeng. Railway Engineering Geology[M]. Beijing: China Railway Publishing House, 1988 .
[ 5 ] 赵建昌,刘世忠, 等. 铁路选线中的工程地质问题[J]. 中国地质灾害与防治学报, 2001(1): 7-9 .
Zhao Jianchang, Liu Shizhong, et al. Engineering Geological Problems in Railway Engineering Construction[J]. The Chinese Journal of Geological Hazard and Control. 2001(1): 7-9.
[ 6 ] 穆藩蒲. 山区铁路选线的研究[J]. 铁道建筑, 1994(6): 15-19.
Mu Panpu. Study on Mountain Railway Route Selection[J]. Railway Engineering, 1994(6): 15-19.
[ 7 ] 唐伟华, 陈明浩. 大瑞铁路澜沧江大桥桥址工程地质比选研究 [ J]. 铁道工程学报, 2008( 4): 8-11.
Tang Weihua, Chen Minghao. Comparative Study on Engineering Geology for Site Selection of Lancang River Bridge on Dali-Ruili Railway[J]. Journal of Railway Engineering Society, 2008(4): 8-11.
[ 8 ] 葛根荣. 大理至瑞丽铁路的防灾减灾选线原则[J]. 路基工程, 2006(5): 46-48.
Ge Genrong. Principles of Disaster Prevention and Disaster Reduction Route Selection in Dali-Ruili Railway[J]. Subgrade Engineering, 2006(5): 46-48.
[ 9 ] 杜宇本, 张强, 蒋良文, 等. 街子坡向斜岩溶水系统及隧道涌突水危险性研究[J]. 铁道工程学报, 2009(12): 60-64.
Du Yuben, Zhang Qiang, Jiang Liangwen, etc. Research on Karst Water System of the Jiezipo Syncline and the Risk of Gushing-and-bursting Water in Tunnel[J]. Journal of Railway Engineering Society, 2009(12): 60-64.
[ 10] 丁文富. 蒙河铁路主要地质灾害与地质选线 [ J]. 铁道工程学报, 2008( 4): 12-15.
Ding Wenfu. The Main Geological Disaster and Geological Route Selection of Mengzi-Hekou Railway[J]. Journal of Railway Engineering Society, 2008(4): 12-15.
|
|
|
|