Study on Settlement Deformation of Open-cut Tunnel of Xiamen Submarine Tunnel and Disposal Technology |
GUO Yan-jing, WEI Ying-hua, HUANG Ming-qi |
China Railway 22nd Engineering Group Co. Ltd., Beijing 100043, China |
|
|
Abstract Research purposes:Before construction of Mingan open tunnel of Xiamen Submarine Tunnel, water was collected in many ditches and depression areas near the tunnel portal. The foundation base of the inverted arch was under grounder water table line. Before filling soil for the open tunnel, many cross hoop tensile crack arisen by uneven settlement happened on the structures of the open tunnel. Assuming the tunnel had hollow elastic grade beam structure, the ANSYS 10.0 finite element software and the structure-load model were used to calculate the flexural torque for determining the safety coefficient and the load characteristics of the structure for the purpose of providing the theoretical basis for working out the reasonable disposal scheme.
Research conclusions:(1) During the grouting, more attention should be paid to the grouting pressure and adjusting the pressure if necessary to avoid the damage to the structure. (2) The attention should be paid to inspection of stringing and leaking the slurry. (3) To avoid the stringing slurry by grouting hole, the skipping boring method should be adopted and the intermittent grouting method should be adopted with multiple times of grouting from high pressure to low pressure. (4) Lowering the tube for boring should not damage the internal main reinforcement the tunnel to avoid the appearance of damage arisen by the stress concentration, resulting in lowering the safety coefficient.
|
Received: 29 January 2010
|
|
|
|
|
[ 1 ] 曾超, 张建斌. 厦门翔安(海底)隧道土建工程简介[C]//海底与水下隧道国际学术交流会. 北京: 北京交通大学, 2005: 12-23.
Zeng Chao, Zhang Jianbin. Introduction of Xiamen Xiangcan Subsea Tunnel Civil Engineering[C]//International Conference on the Undersea Tunnels. Beijing: Beijing Jiaotong University, 2005: 12-23.
[ 2 ] 郭衍敬, 张明聚, 张斌. 海底隧道穿越风化深槽施工方案[J]. 北京工业大学学报, 2006(6): 520-525.
Guo Yanjing, Zhang Mingju, Zhang Bin. A Construction Solution to Tunneling through the Deep Weathered Rock Trough of sub-sea Tunnels[J]. Journal of Beijing University of Technology, 2006(6): 520-525.
[ 3 ] JGJ 120—99,建筑基坑支护技术规程[S].
JGJ 120—99, Code for Excavation Bracing Technology ofConstruction[S].
[ 4 ] 高名游, 徐建. 钢筋混凝土结构设计实例[M]. 北京: 中国铁道出版社, 1997.
Gao Mingyou, Xu Jian. The Example of Structure Design for Reinforced Concrete[M]. Beijing: China Railway Publishing House, 1997.
[ 5 ] 于学馥, 郑颖人, 刘怀恒. 地下工程围岩稳定分析[M]. 北京: 煤炭工业出版社, 1980.
Yu Xuefu, Zheng Yingren, Liu Huaiheng. The Stabilination Analysis of Rock for Underground Engineering[M]. Beijing: China Coal Industry Publishing House, 1980.
[ 6 ] Arild Palmstrom,Characterizing Rock Mass by the RMI for Use in Practical Rock Engineering[J]. Tunneling and Underground Technology, 1996(2): 175-188.
[ 7 ] 持田丰. 青函隧道的破碎带的稳定处理[J]. 汪景俊, 译. 隧道译丛, 1978(6): 14-25.
Feng Chitian. The Stabilization Disposal of the Fragmentation Strap of Seikan Tunnel[J]. WANG Jingjun Translation. Tunnel Translation Book, 1978(6): 14-25.
[ 8 ] T.Kawamoto,Y. Ichikacwa & T.Kyoya. Deformation and Fracturing Behaviour of Discontinous Rock Mass and Damage Mechanics Theory[J]. Int. J. Num. Analy. geo, 1988(4): 321-327.
[ 9 ] 林银飞, 郑颖人. 弹塑性有限厚条法及工程应用[J]. 工程力学, 1997(2): 108-112.
Lin Yinfei, Zheng Yingren. Finite Thick Strip Method of Elasticity and Plasticity and Its Use[J]. Engineering Mechanics, 1997(2): 108-112.
[ 10 ] 黄成光, 于敦荣. 公路隧道施工[M]. 北京: 人民交通出版社, 2001.
Huang Chengguang, Yu Guorong. The Construction of Highway Tunnel[M]. Beijing: China Communications Press, 2001.
|
|
|
|