Monitoring Deformation of Existing Ground Track of Urban Rail Transit Caused by Under-passing of High-tension Cable Pipeline |
MA Xue-mei1, WU Feng-bo2 |
1.Beijing Urban Construction Exploration & Surveying Design Research Institute Co. Ltd., Beijing 100101, China;2.Chinese Academy of Sciences, Beijing 100029, China |
|
|
Abstract Research purposes:The project of large diameter under-passing the existing ground track of urban rail transit faces the large engineering risks. The strict monitoring should be conducted to the existing ground track in order to guarantee the engineering going on smoothly and the traffic safety of the existing track. This paper mainly introduces monitoring the deformation of the existing ground track caused by the under-passing of pipelines for providing the reference to the similar works.
Research conclusions:Affected by the under-passing of the pipelines, the roadbed of the existing track experienced the process of apparent settlement during construction, apparent post-construction settlement, settlement becoming slow and settlement becoming stable. As the roadbed settlement was large and the rail settlement increased relatively, the rail was uplifted necessarily. The track geometric deformation and rail displacement were small and didn't exceed the control values. Affected by soil disturbances and the seasonal change of the groundwater level, the structure of Shangdi Bridge near the engineering site floated and the differential settlement between the Bridge and the roadbed increased. The attention would be paid to the influence of the back fill soil and ground water on the bridge.
|
Received: 06 December 2009
|
|
|
|
|
[ 1 ] 马振海, 于春华. 地铁主体结构变形监测的必要性分析[J]. 铁道工程学报, 2008(8): 93-95.
Ma Zhenhai, Yu Chunhua. Analysis of Necessity of the Primary Structural Transmutation Observation in Subways[J]. Journal of Railway Engineering Society, 2008(8): 93-95.
[ 2 ] 金淮, 吴锋波, 马雪梅, 等. 隧道下穿地铁拟换乘车站施工监测与安全分析[J]. 工程地质学报, 2009(5): 703-710.
Jin Huai, W u Fengbo, Ma Xuemei etc. Monitoring Measurement and Safety Analysis for Construction of Tunnel Beneath Passenger Transferring Subway Station in Beijing[J]. Journal of Engineering Geology, 2009(5): 703-710.
[ 3 ] 马雪梅, 吴锋波, 任干. 南水北调总干渠近距离下穿地铁既有车站变形特性分析[J]. 岩土工程界, 2009(9): 71-75.
Ma Xuemei, Wu Fengbo, Ren Gan. Deformation Characteristics of the SNWTP Main Canal Tunnel Short-distance under Existing Subway Station[J]. Geotechnical Engineering World, 2009(9): 71-75.
[ 4 ] 张建全. 地下工程施工对地铁既有线变形影响的分析与研究[J]. 矿山测量, 2008(5): 60-63.
Zhang Jianquan. Analysis and Research of the Existing Subway Deformation Affected by Underground Construction[J]. Mine Surveying, 2008(5): 60-63.
[ 5 ] 鲍永亮, 郑七振, 唐建忠. 地铁隧道旁通道冻结法施工监测分析[J]. 铁道工程学报, 2009(3): 93-96.
Bao Yongliang, Zheng Qizhen, Tang Jianzhong. Monitoring Analysis of Construction for Connecting Aisle in Metro Tunnel with Freezing Method[J]. Journal of Railway Engineering Society, 2009(3): 93-96.
[ 6 ] GB 50308—2008, 城市轨道交通工程测量规范[S].
GB 50308—2008, Code for Urban Rail Transit Engineering Survey[S].
[ 7 ] JGJ 8—2007,建筑变形测量规范[S].
JGJ 8—2007, Code for Deformation Measurement of Building and Structure[S].
[ 8 ] 秦长利. 城市轨道交通工程变形监测测量精度探讨[J]. 都市快轨交通, 2008(2): 63-66.
Qin Changli. Precision Criteria of Deformations and Settlements in Monitoring of Urban Rail Transit Projects[J]. Urban Rapid Rail Transit, 2008(2): 63-66.
[ 9 ] 秦长利. 工程测量在信息化测绘战略跨越中的拓展[J]. 工程勘察, 2009 (12): 11-16.
Qin Changli. The Development of Engineering Surveying Ininfo-engineering Surveying Strategy[J]. Geotechnical Investigation & Surveying,2009(12): 11-16.
[ 10 ] 徐万鹏. 绝对变形量的相对位移法监测[J]. 铁道工程学报, 2006(8): 49-52.
Xu Wanpeng. Monitoring Absolute Amount of Deformation with Relative Displacement Method[J]. Journal of Railway Engineering Society, 2006(8): 49-52.
|
|
|
|