Study on Scheme for Reconstruction of Baotou-Xi'an Railway Corridor |
WEI Zhou-quan |
China Railway First Survey and Design Institute Group Ltd., Xi'an, Shanxi 710043, China |
|
|
Abstract Research purposes:The Baotou-Xi'an Railway Corridor is an important part of Baotou-Liuzhou Railway Corridor. This paper gives an introduction to the current situation of the Baotou-Xi'an Railway and studies the upgrading scale of this existing railway.
Research conclusions:In view of the role and effect to be played and made by this railway, the Baotou-Liuzhou Railway will become double-line railway at last with large traffic capacity. In order to give full play to the whole traffic capacity of this railway corridor, when upgrading this railway, the double-line from Baotou to Dabaodang in the north section should be built with the target speeds of 160 km/h and 200 km/h in future, the second line from Dabaodang to Yan'an in the middle section should be built with the target speed of at160 km/h, and the new double-line from Yan'an toXi'an in the south section should be built with target speeds of 160 km/h and 200 km/h in future. The existing line remain its original to form the three-line pattern. The early built-up double-line from Baotou to Xi'an will not only solve the problem of insufficient traffic capacity for outwardly transporting coal, but also solve the problem of the insufficient through traffic capacity. So this pattern accords with the general planning of Baotou-Liuzhou double-line with large traffic.
|
Received: 15 April 2010
|
|
|
|
|
[ 1 ] GB 50090—2006, 铁路线路设计规范[S].
GB 50090—2006,Code for Design of Railway Line[S].
[ 2 ] 铁建设函[2005]285号, 新建时速200公里客货共线铁路设计暂行规定[S].
Railway Construction Letter [2005] NO.285, Interim Design Provisions of Newly-built 200 km/h Mixed Passenger and Freight Railway[S].
[ 3 ] TBT 1407—1998, 列车牵引计算计算规程[S].
TBT 1407—1998, Regulations for Train Traction Calculation[S].
[ 4 ] TB 10082—2005, 铁路轨道设计规范[S].
TB 10082—2005, Technical Management Regulations for Railways[S].
[ 5 ] 中华人民共和国铁道部. 铁路技术管理规程[M]. 北京: 中国铁道出版社, 2006.
MOR. Railway Technical Management Regulation[M]. Beijing: China Railway Publishing House, 2006.
[ 6 ] 铁道第一勘察设计院. 包西铁路通道扩能工程预可行性研究总说明书[Z].兰州: 铁道第一勘察设计院, 2005.
FSDI. General Instruction of Prefesibility Study of Baotou-Xi'an Railway Passage Capacity Expansion Project[Z]. Lanzhou: FSDI, 2005.
[ 7 ] 铁道第一勘察设计院. 包西铁路通道大保当至张桥段可行性研究总说明书[Z]. 西安: 铁道第一勘察设计院, 2006.
FSDI. General Instruction of Prefesibility Study of Dabaodang-Zhangqiao Section of Baotou-Xi'an Railway[Z]. Xi'an: FSDI, 2006.
[ 8 ] 胡思继. 铁路行车组织[M]. 北京: 中国铁道出版社, 1998.
Hu Siji. Organization of Railway Operation[M]. Beijing:China Railway Publishing House, 1998.
[ 9 ] 王兆成, 黄民. 中长期铁路网规划研究[M]. 北京: 中国铁道出版社, 2004.
Wang Zhaoming, Huang Min. Railway Network Planning Research in Long and Medium Term[M]. Beijing: China Railway Publishing House, 2004.
[ 10 ] 易思蓉. 铁路选线设计[M]. 成都: 西南交通大学出版社, 2001.
Yi Sirong. Railway Alignment Design[M]. Chengdu: Southwest Jiaotong University Publishing House, 2001.
|
|
|
|