|
|
Research on Schemes for Leading Shangqiu-Fuyang-Hangzhou Railway into Hefei Terminal |
Dong Zhi-qiang |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China |
|
|
Abstract Research purposes:Following the design ideas of "Putting m an first, serving the transportation, strengthening the fundament and weakening the trivial, optimizing the system and focusing on the development" and considering the current situation and the projects under construction, to be constructed and planned of Hefei railway terminal, the study and comparison are made among the recommended schemes for accumulating the experience to the study on general layout and design of the railway terminal.
Research conclusions:With construction of Hefei South Railway Station, the Hefei railway terminal will form the pattern of two passenger stations. Base on the this pattern, the study is done on the four schemes: central leading into Hefei South station, leading Shangqiu-Fuyang-Hangzhou PDL into Hefei Station, leading Shangqiu-Fuyang-Hangzhou PDL into Hefei South Station, and building new passenger station for Shangqiu-Fuyang-Hangzhou PDL. Through study and com parison, it is concluded the scheme o f central leading into Hefei South station has obvious advantages in transport organization, passenger travel and coordination in capacities of the line and station. As the construction of Hefei South Station already starts , there are some uncertainties in modifying the Hefei South Station. So it is proposed to make further comparison between the scheme of central leading into Hefei South Station and the scheme of leading Shangqiu-Fuyang-Hang zhou PDL into Hefei South Station in the next stage according the possibility of modifying the Hefei South Station.
|
Received: 30 March 2010
|
|
|
|
|
[ 1 ] GB 50090—2006, 铁路线路设计规范[S].
GB 50090—2006, Code for Design of Railway Line[S] .
[ 2 ] GB 50091—2006, 铁路车站及枢纽设计规范 [S].
GB 50091—2006, Code for Design of Railway Station and Terminal[S].
[ 3 ] TB 10621—2009, 高速铁路设计规范(试行)[S] .
TB 10621—2009, Code for Design of High Speed Railway[S].
[ 4 ] 铁道第四勘察设计院. 铁路工程设计技术手册·站场及枢纽[K]. 北京: 中国铁道出版社, 2004.
The Fourth Survey and Design Institute. Railway Engineering Technical Manual-Station and Yard and Terminal[K]. Beijing: China Railway Publishing House, 2004.
[ 5 ] 中华人民共和国铁道部. 中长期铁路网规划(2008年调整)[Z]. 北京: 中华人民共和国铁道部, 2008.
MOR. China National Development and Reform Commission. Mid-long Term Railway Network Plan(Adjustment 2008)[Z]. Beijing: MOR, 2008.
[ 6 ] 铁道第三勘察设计院集团有限公司. 新建商丘至阜阳至杭州铁路预可行性研究[R]. 天津: 铁道第三勘察设计院集团有限公司, 2010.
The Third Railway Survey and Design Institute Group Corporatation. Pre-feasibility Research on Shangqiu-Fuyang-Hangzhou Newly-built Railway [R]. Tianjin : The Third Railway Survey and Design Institute Group Corporatation, 2010.
[ 7 ] 中铁第四勘察设计院集团有限公司. 长江三角洲地区城际铁路网规划(修编)[Z]. 武汉: 中铁第四勘察设计院集团有限公司, 2009.
China Railway Siyuan Survey and Design Group Co. Ltd. Inter-city Railway Network Plan for Chang Jiang Fertile Fields(Revision)[Z]. Wuhan: China Railway Siyuan Survey and Design Group Co . Ltd, 2009.
[ 8 ] 中铁第四勘察设计院集团有限公司. 新建合肥至福州铁路可行性研究[R]. 武汉: 中铁第四勘察设计院集团有限公司, 2009 .
China Railway Siyuan Survey and Design Group Co. Ltd. Feasibility Research on Hefei-Fuzhou Newly-built Railway[R]. Wuhan: China Railway Siyuan Survey and Design Group Co . Ltd, 2009.
|
|
|
|