Technology for Construction of Hanguguan Tunnel Under-passing New Loess Gulch |
ZHANG Ying-cai |
China Railway No.3 Engineering Group Co. Ltd, Taiyuan, Shanxi 030001, China |
|
|
Abstract Research purposes:The study is done on the influences of construction of the tunnel under-passing new loess gulch on the bias and the construction technology is presented to prevent tunnel collapse.
Research conclusions:(1) To take some measures, such as refilling soil-cement, building concrete ditch, driving biting piles, can prevent the penetration and corruption of ground water, eliminate the impact of ground water on collapsible loess and enhance the stability of gulch and side slope. (2) To consolidate sand strata with sodium silicate grouting can reduce the surface subsidence caused by tunneling and guarantee the tunneling stability. (3) To enhance the strength and rigidity of the primary support for tunnel lining can control the support deformation caused by tunneling and effectively control the influences of the tunnel bias (4) To optimize CRD construction method can shorten the distance and time of working procedure and make the primary lining forming a circle as soon as possible to well control the tunnel deformation and surface subsidence.
|
Received: 06 February 2010
|
|
|
|
|
[ 1 ] 王梦恕. 北京地铁浅埋暗挖施工法[J]. 岩石力学与工程学报, 1989 (1): 52-62.
Wang Mengshu. Shallow Underground Excavation Method in Beijing Subway Construction[J]. Chinese Journal of Rock Mechanics and Engineering, 1989(1): 52-62.
[ 2 ] 梁文灏, 等. 郑西客运专线大断面黄土隧道设计与施工技术要点[C]//2006中国高速铁路隧道国际技术交流会论文集. 北京: 中国铁道出版社, 2006: 147-161.
Liang Wenhao, etc. Main Point of Design and Construction Technology for Loess Tunnel with Large Cross Section in Zhengzhou-Xi'an Passenger Dedicated Line Program[C]//The Collection of Theses at China International Symposium 2006 on High Speed Railway Tunnels. Beijing: China Railway Publishing House, 2006: 147-161.
[ 3 ] 王晓州, 等. 大断面失陷性黄土隧道施工技术[C]//2006中国高速铁路隧道国际技术交流会论文集. 北京: 中国铁道出版社, 2006: 497-509.
Wang Xiaozhou, etc. Construction Technology for Collapsible Loess Collapsible Loess with Large Cross Section[C]//The Collection of Theses at China International Symposium 2006 on High Speed Railway Tunnels. Beijing: China Railway Publishing House, 2006: 497-509.
[ 4 ] TZ 204—2008, 铁路隧道工程施工技术指南[S].
TZ 204—2008, Technical Guidance on Construction of Railway Tunnel Works[S].
[ 5 ] 王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥: 安徽教育出版社, 2004.
Wang Mengshu. A General Survey on Shallow Underground Excavation Technology of Underground Engineering[M]. Hefei: Anhui Educational Publishing House, 2004.
[ 6 ] 许亚军. 超浅埋暗挖隧道下穿高速公路的施工技术[J]. 隧道建设, 2009(1): 101-104.
Xu Yajun. Construction Technology For Super-shallow-buried Underground Excavated Tunnels Crossing Underneath Freeway[J]. Tunnel Construction, 2009(1): 101-104.
[ 7 ] 关宝树. 隧道工程施工要点集[M]. 北京: 人民交通出版社, 2003.
Guan Baoshu. The Collection of Main Point of Tunnel Construction Technology [M]. Beijing: China Communication Press, 2003.
[ 8 ] 刘招伟. 浅埋大跨连拱隧道施工中变形的监测与控制措施[J]. 岩土工程学报, 2003(3): 339-342.
Liu Zhaowei. Measures of Monitoring & Measurement for deformation During Tunneling of Shallow Buried Large-spanned Double-arch Tunnels[J]. Chinese Journal of Geotechnical Engineering, 2003(3): 339-342.
[ 9 ] 高军, 李建华. 浅埋大跨软弱地层隧道动态反馈施工技术[J]. 隧道建设, 2007(2): 57-59.
Gao Jun, Li Jianhua. Dynamic Feed-back Construction Technology for Shallow-buried Soft Ground Tunnels with Large Spans[J]. Tunnel Construction, 2007(2): 57-59.
[ 10 ] 徐海庭, 王全胜, 孙国庆, 等. 注浆效果检查评定技术与应用实例[J]. 铁道工程学报, 2009(1): 67-71.
Xu Haiting, Wang Quansheng, Sun Guoqing, etc. Evaluation Technique of Grouting Effect and its Application to Engineering[J]. Journal of Railway Engineering Society, 2009(1): 67-71.
|
|
|
|