|
|
Application of Fuzzy Analytic Hierarchy Process in Choice of Maximum Track GradientValue |
QI Yong-guo |
China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes: Choice of the maximum gradientof railway track involves in many factors. The fuzziness and relativity exist when these factors are considered two by two, so sometimes it is difficult to choose the maximum track gradient because many quantitative and qualitative aspects need to be considered to make a comprehensive evaluation.
Research conclusions: Regarding the Nanjing -Hangzhou Railway as a system, according to the track alignment, to pographical conditions and geological characteristics along the railway, the analyses of the effects of the different maximum track gradients on the construction safety and reliability, train operating costand adaptability of EMU are made with fuzzy analytic hierarchy process. Based on the analyses, it is recommended that the maximum track gradient of this railway is 12‰ for optimizing this railway system and the maximum track gradient in some areas can be 20‰ for protecting environmentand saving investment. Application of this method in choice of the maximum track gradient is effective and operable and it can be the reference to the similar work.
|
Received: 09 April 2010
|
|
|
|
|
[1] 张庆年.交通运输系统分析与优化[M ].武汉:武汉理工 大学出版社, 2005.
Zhang Qingnian. Transportation System Analysis and Optimization [M ]. Wuhan: Wuhan University of Technology Press, 2005.
[2] 汪浩,马武生. Fuzzy综合评价模型在京杭大运河扬州段 水质评价中的应用[J].淮海工学院学报, 2008(12): 57 - 60.
Wang Hao, Ma Wusheng. Application of Fuzzy Synthetic Evaluating Model to the Assessment of Water Quality in the Grand Canal(Yangzhou Section) [J]. Journal of Huaihai Institute of Technology, 2008(12): 57 -60.
[3] 陈文科.郑州至武汉铁路客运专线最大坡度值研究[J]. 铁道勘察, 2008(1): 44 -47.
Chen Wenke. Research on Maximum Gradient Value of Zhengzhou -Wuhan Passenger Dedicated Railway Line [J]. Railway Investigation, 2008(1): 44 -47.
[4] 王成.多指标综合评价的一种灰色模糊决策方法[J]. 延边大学学报, 2007(3): 12 -15.
Wang Cheng. A Grey Fuzzy Decision Making Method Of Multiindex Comprehensive Evaluation [J]. Journal Of Yanbian University, 2007(3): 12 -15.
[5] 陈亮.贵阳至广州线线路最大坡度方案比选[J].铁道 工程学报, 2008(8): 18 -22.
Chen Liang. Scheme Alternative of Maximum Route Gradient on Guiyang - Guangzhou Railway [ J ]. Journal of Railway Engineering Society, 2008(8): 18 - 22.
[6] 后宗彪.京沪高速铁路最大坡度研究[J].铁道标准设 计, 2008(6): 5 -7.
Hou Zongbiao. Maximum Slope of the Beijing - Shanghai High Speed Railway [J ]. Railway Standard Design, 2008(6): 5 -7.
[7] 支林仙,朱宇阳,程德巧.基于多层次模糊综合评判的网 络成瘾评价[J].江西师范大学学报, 2008(10): 525 - 529.
ZhiLinxian, Zhu Yuyang, Cheng Deqiao. Evaluation for Network Addiction Based on Multilevel Fuzzy Synthesis Assessment [J ]. Journal of Jiangxi Normal University, 2008(10): 525 -529.
[8] 许明丽,方天堃.水库社会评价的模糊综合评价与层次 分析法和德尔菲法耦合方法[J].吉林农业大学学报, 2007(2) : 229 -232.
Xu Mingli, Fang Tiankun. Fuzzy Comprehensive Evaluation Method with Coupling AHP and Delphi Method for Reservoir Social Assessment[J]. Journal of Jilin Agricultural University, 2007(2) : 229 -232.
[9] Liang Zhai, Xinming Tang. Fuzzy Comprehensive Evaluation Method and Its Application in Subjective Quality Assessment for Compressed Remote Sensing Images[J]. Fuzzy System s and Knowledge Discovery, 2007(8): 145 -148.
[10]Jie Yao, Li-chun Wang, Bin -B in Liu. Application of Fuzzy Comprehensive Evaluation Method for Bid Evaluation of Power Equipment Based on Weight of Entropy [ J ]. Information Managem ent, Innovation Management and Industrial Engineering, 2009(12): 456 - 458.
|
|
|
|