Analysis of Tunnel Support and Reinforcement in Intersection of Corridor and Tunnel |
HE Wei-qi1,HE Ya-bo1,WANG Yu-ze2 |
1.Wuhan University,Wuhan,Hubei 430072,China; 2.China Railway Siyuan Survey and Design Group Co.Ltd,Wuhan,Hubei 430063,China |
|
|
Abstract Research purposes:For reducing the impact of the cross - over construction of the long belt surface conveyance corridor for limestone of the cement plant on the shallow - buried section of the right tunnel of the Wanhuayan Tunnel ( under construction) of Chenzhou - Ningyuan Highway,the study was done and the analysis is made for the causes for the collapse of the working face of the tunnel in early stage under the conditions of initial support,and the causes for the roof collapse are found out by means of test analogue of steel frame support and approximate analysis of supports under the condition. of the reinforcement for the tunnel in later stage. The discussion is made on the reinforcement scheme for the tunnel in later stage from the aspects of economy,technology and risk.Finally,aiming at the hidden risks,the reasonable measures are offered for avoiding the risks to reduce loss.
Research conclusions: The adjacent ( interface) constructions of the corridor and tunnel from above must be reported for approval according to relevant construction procedure. For the synchronical constructions,the construction sequences of " the engineering at lower place before the engineering at high place" and " important engineering before ordinary engineering" should be followed.For the shallow tunnel that its roof will collapse under the initial support due to the full~heavy weathered surrounding rock and long-span in,the surface grouting should be conducted first to ensure the safety of person and final implementation of the option.
|
Received: 04 March 2011
|
|
|
|
|
[1] JTG D70—2004,公路隧道设计规范[S].
JTG D70—2004,Code for Design of Road Tunnel[S].
[2] 大瑶山隧道科技情报组.大瑶山隧道专题情报资料( 第十期) ·隧道钢支撑的试验研究[K].成都: 西南交通大学,1983.
The Group of Dayaoshan Tunnel Technology & Information .Dayaoshan Tunnel Topic of Information· ( No 10) ·The Experiment & Research of Tunnel Steel Support[K].Chengdu: Southwest Jiaotong University, 1983.
[3] 铁道部第二勘测设计院.铁路工程技术手册·隧道[K] ( 修订版) .北京: 中国铁道出版社,1999.
The No. 2 Survey & Design Institute of China Railways. Work on the Railway Design Techniqu Handbook· Tunnel[K]( Revise) .Beijing: China Railway Publishing House,1999.
[4] 朱汉华,王迎超,祝江鸿,等. 隧道预支护原理与施工技术[M]. 北京: 人民交通出版社,2008.
Zhu Hanhua,Wang Yingchao,Zhu Jinghong,etc. Tunnel Pre - supporting Principle and Construct Technology[M].Beijing,China Communications Press, 2008.
[5] 何伟奇.新鲤鱼溪二号隧道洞口高仰坡滑坡体的防护论证[J].现代隧道技术,2003(2) :13-17.
He Weiqi. Reinforcement Treatment for Landslide of High Slope at the Portal of the Second Xinliyuxi Tunnel [J]. Modern Tunnelling Technology,2003(2) :13-17.
[6] 孙国庆.下穿隧道建筑物保护方案比选及注浆方案试验研究[J].铁道工程学报,2010(9) :35-40.
Sun Guoqing.Comparison ang Choice of Protective Schemes for Building Around Underpassing Tunnel and Experimental Study on Grouting Scheme[J].Journal of Railway Engineering Society,2010(9) : 35-40.
[7] 何伟奇. 有效抑制地表建筑物沉降的软岩浅埋隧道设计与施工[J]. 铁道工程学报,2001(3) :53-55.
He Weiqi. Design and Construction of Shallow Tunnel With Soft Surrounding Rock for Effectively Restraining Subsidence of Surface Buildings[J].Journal of Railway Engineering Society,2001(3) : 53-55.
[8] 郑宝才,程文斌,胡国伟.浅埋暗挖法施工近接交叉地铁隧道地表沉降监测分析[J].铁道工程学报,2009(1) : 72-76.
Zheng Baocai,Cheng Wenbin,Hu Guowei.Analysis and Monitoring of Ground Subsidence Caused by Excavation of Adjacent ang Crossing Metro Tunnel with Shallow - depth and Subsurface Excavation Method[J]. Journal of Railway Engineering Society,2009(1) : 72-76.
|
|
|
|