Luo Zujiang,Liu Jinbao,Li Lang.Three - dimensional Full Coupling Numerical Simulation of Groundwater Dewatering and Land Land - subsidence in Quaternary Loose Sediments[J]. Chinese Journal of Geotechnical Engineering,2008(30) : 193-198.
[6] 李筱艳. 基于位移反分析的深基坑渗流场与应力场完全耦合分析[J]. 岩石力学与工程学报,2004(23) : 1269-1274.
Li Xiaoyan.Fully Coupling Analysis Nalysis of Seepage and Stress for Deep Foundation Pit Based on Displacement Back Analysis[J].Chinese Journal of Rock Mechanics and Engineering,2004 (23) : 1269-1274.
[7] 胡涛,冯晓腊.武汉地区基坑降水引起的地面沉降机理及定量预测[J].土工基础,2002(2) :16-20.
Disucssion About the Mechamism and Quantitative Forecast of the Surface Subsidence Induced by Dewatering in Deep Foundation Pits in Wuhan Area [J].Soil Engineering and Foundation,2002(2) : 16-20.
[8] 机械工业第三勘察设计研究院.武汉市轨道交通四号线一期工程 IV 标段(工业路站) 岩土工程勘察报告[R].重庆: 机械工业第三勘察设计研究院,2009.
The Third Survey and Design Institute of Mechanical Industry. Report of Engineering Site Geotechnical Investigation for Wuhan Line 4 Railway Traffic First Phase IV Section (gongyelu station) [R].Chongqing: The Third Survey and Design Institute of Mechanical Industry,2009.