Reinforcement Method for Yushu Earthquake Ruins |
YANG Zong - lin1,ZHU Ben -zhen2,ZHANG Xiao -bing2 |
1.China Railway Group Limited,Beijing 100039,China; 2.Northwest Research Institute Co.Ltd of CREC,Lanzhou,Gansu 730000,China |
|
|
Abstract Research purposes:The 7.1 magnitude earthquake took place in Yushu on April 14,2010 and it caused collapse of many resident houses and almost razed the Jiegu Town to the ground.For remembering this historic event,the damaged Gesaer Hotel was determined as the earthquake ruins,so it was necessary to protect and reinforce the hotel.The design of the reinforcement scheme was researched and the reinforcement construction process of the hotel was summarized for the purpose of providing the reference to the similar works.
Research conclusions: Based on research on the reinforcement scheme,the design and construction of the Gesaer Hotel,the following key points of reinforcing and protecting the earthquake ruins are concluded: (1) The in - site investigation and assessment should be conducted in detail and the construction procedure should be arranged reasonably before reinforcing.The engineering of avoiding the building toppling down should be conducted before conducting the reinforcement engineering of the building structure.(2) Based on the latest actual in - site investigation data and knowledge,the reinforcement programme should be adjusted and optimized for guaranteeing the construction security and effectively protecting the ruins.(3) During and after the reinforcement engineering,the monitoring spots should be installed in the major ports of the building,and the security of the building and person can be guaranteed and the reinforcement effect can be known by dynamic monitoring the deformation change.
|
Received: 20 May 2011
|
|
|
|
|
[1] GB 50011—2001,建筑抗震设计规范(2008版) [S].
GB 50011—2001,Code for Seismic Design of Buildings (2008 Edition) [S].
[2] GB 50051—2002,烟囱设计规范[S].
GB 50051—2002,Code for Design of Chimney[S].
[3] GB 50003—2001,砌体结构设计规范[S].
GB 50003—2001,Code for Design of Masonry Structures[S].
[4] GB 50010—2002,混凝土结构设计规范[S].
GB 50010—2002,Code for Design of Concrete Structure[S].
[5] GB 50009—2001,建筑结构荷载规范(2006版)[S].
GB 50009—2001,Load Code for the Design of Building Structures ( 2006 Edition) [S].
[6] 黄兴楷.建筑物鉴定加固与增层改造[M].北京: 中国建筑工业出版社,2008.
Huang Xingkai.Identify the Strengthening and Adding Layers of Buildings[M].Beijing: China Building and Industry Press,2008.
[7] 岳清瑞,杨勇新.复合材料在建筑加固、修复中的应用[M].北京: 化学工业出版社,2006.
Yue Qingrui,Yang Yongxin.The Application of Composite Materials in the Reinforced and Repaired Buildings [M].Beijing: Chemical Industry Press, 2006.
[8] 郭樟根,刘佳亮,孙伟民.FRP 加固砌体结构的研究与应用[J].南京工业大学学报,2008(1) :109-114.
Guo Zhanggen,Liu Jialing,Sun Weimin.Research and Application of FRP Reinforced Nasonry Structures[J]. Journal of Nanjing University of Technology ( Natural Science Edition) ,2008(1) : 109-114.
[9] 青海省住房和城乡建设厅.玉树灾区灾后重建相关文件汇编[G].青海: 青海省住房和城乡建设厅,2010.
Qinghai Department of Housing and Urban - rural. Documents of Post - disaster Reconstruction in Yushu Disaster Area[G].Qinghai: Qinghai Department of Housing and Urban-rural,2010.
|
|
|
|