Blasting Control Technology for Shallow Large Span Tunnel Under - passing Buildings and Monitoring Analysis of Blasting |
ZHANG Jun-bing1,ZHENG Bao-cai1,YU Hai-tao2,KANG Kai2 |
1.China Railway No 3 Engineering Group Co.Ltd,Taiyuan,Shanxi 030001,China; 2.The 4th Affiliated Company,China Railway No 3 Engineering Group Co.Ltd,Beijing 102300,China |
|
|
Abstract Research purposes:The blasting vibration velocity was monitored and the monitoring data was analyzed for blasting the tunnel of the connecting line of the Kiaochow Bay Undersea Tunnel under - passing the building group in order to ensure the structure safety of the building group on the ground,and summary was also made on the blasting control technology for providing the preference to the similar projects.
Research conclusions:The practice of construction showed the blasting control technology of advanced small pilot tunnel and sequential excavation used for the construction of shallow large span tunnel under - passing the building group was feasible to protect the safety of building group on the ground. The blasting monitored data showed that the largest blasting vibration velocity and main vibration frequency were in the allowable range, and the blasting parameters were reasonable. Application of the triple composite cutting method could improve the blasting efficiency,control the maximum charge per interval,reduce the blasting vibration velocity and benefit the protection of the buildings on the ground.
|
Received: 28 January 2011
|
|
|
|
|
[1] 顾毅成,史雅语,金骥良.工程爆破安全[M].合肥: 中国科学技术大学出版社,2009.
Gu Yicheng,Shi Yayu,Jin Jiliang.Engineering Blasting Safety[M].Hefei: Press of University of Science and Technology of China,2009.
[2] 余永强,文广超.地铁隧道爆破开挖对地表建筑物的影响[J]. 辽宁工程技术大学学报,2007(12) :871-873.
Yu Yongqiang,Wen Guangchao.Effect of Blasting Digging on Surface Buildings in Metro Tunnels [J]. Jouma1 of Liaoning Technical University,2007 (12) : 871-873.
[3] 申玉生,高 波,王志杰,等. 复线隧道施工爆破对既有隧道结构的影响分析[J]. 地下空间与工程学报,2009 (10) :980-984.
Shen Yusheng,Gao Bo,Wang Zhijie,etc.Efect of Blasting in Double Line Tunnel on Existing Tunnel[J]. Chinese Journal of Underground Space and Engineering,2009(10) : 980-984.
[4] 李现森,付迎春,孙星亮. 青黄海底隧道接线工程近接地面建筑物段爆破震动控制数值分析[J].石家庄铁道学院学报(自然科学版) ,2007(12) :71-74.
Li Xiansen,Fu Yingcun,Sun Xingliang. A Finite Element Analysis of Blasting Vibration in Qingdao - Huangdao Cross - harbor Tunnel Guide Line Project [J]. Journal of Shijiazhuang Railway Institute (Natural Science) ,2007(12) :71-74.
[5] 李旭东,白海峰,周志顺. 地面建筑物控制爆破的浅埋隧道暗挖方法研究[J].铁道工程学报,2011(1) : 47-50, 57.
Li Xudong,Bai Haifeng,Zhou Zhishun. Study on Blasting Subsurface Excavation Method for Shallow Tunnel Under - passing Ground Building[J] .Journal of Railway Engineering Society,2011(1) : 47-50,57.
[6] GB 6722—2003,爆破安全规程[S].
GB 6722—2003,Safety Regulations for Blasting[S].
[7] 张继春,曹孝君,郑爽英,等. 浅埋隧道掘进爆破的地表震动效应试验研究[J]. 岩石力学与工程学报,2005(11) : 4158-4163.
Zhang Jichun,Cao Xiaojun,Zheng Shuangying.etc. Experimental Study on Vibration Effects of Due to Shallow Tunnel Blasting [J]. Chinese Journal of Rock Mechanics and Engineering,2005(11) : 4158-4163.
|
|
|
|