2D Forward Simulation of Grouting Karst for Pile Foundation with High - density Resistivity Method |
ZHANG Ji1,SHI Xue - ming2,XIN Min - gao1 |
1. The Third Railway Survey and Design Institute Group Corporation,Tianjin 300142,China; 2. China University of Geosciences,Wuhan,Hubei 430074,China |
|
|
Abstract Research purposes: The high - density resistivity method ( HDR) is a commonly used method for detecting the quality of grouting karst of pile foundation. In order to guide the production practice,RES2DMOD 3. 0 was used for 2D forward simulation with high - density resistivity for grouting karst of pile foundation to the geology - earth physical model .
Research conclusions: The result of numerical simulation shows the full grouting body and defects of grouting karst can be reflected on the resistivity profile drawing respectively by abnormal high resistance and low resistance. The geophysical anomaly is obvious with large abnormal range and small amplitude when using the Wenner array HDR method,and the geophysical anomaly is weaker with small reflection amplitude and vertical distribution when using the Wenner - Schlumberger array and it is difficult to distinguish.
|
Received: 28 March 2011
|
|
|
|
|
[1] 侯勇,王蓉川. 岩溶地区桩基础施工[J]. 铁道工程学报, 2010( 2) : 60 - 63.
Hou Yong, Wang Rong. Construction of Pile Foundation in Karst Area [J]. Journal of Railway Engineering Society,2010( 2) : 60 - 63.
[2] 韩金田. 复合注浆技术在地基加固中的应用研究[D]. 长沙: 中南大学,2007.
Han Jintian. Study on the Complex Grouting Technique in Foundation Reinforce [D]. Changsha: Central South University,2007.
[3] 林华土,黄经纬. 静压注浆在桥梁施工中的应用[J]. 桥梁机械与施工技术,2002( 1) : 42 -44.
Lin Huashi, Huang Jingwei. Application of Static Pressure Mortar Injecting Technique in Bridge Construction [J]. Road Machinery & Construction Mechanization,2002( 1) : 42 - 44.
[4] Fleming W. G. K. The Improvement of Pile Performance by Base Grouting. In: Proc. Instn. Civ. Engrs,1993( 5) : 88 - 93.
[5] 黄小广. 注浆效果检测方法的评价[J]. 煤矿安全,2001 ( 10) : 38 -39.
Huang Xiaoguang. The Evaluation of The Test Method in Grouting[J]. Safety in Coal Mines,2001 ( 10) : 38 - 39.
[6] 郭启锋. 高压喷射注浆质量检测及控制[J]. 西部探矿工程,1998( 4) : 14 -16.
Guo Qifeng. Check and Control of High Pressure Jet Sprouting Quality [J]. WEST - CHINA Exploration Engineering,1998( 4) : 14 - 16.
[7] 陈军,赵永辉,王永强,等. 基坑维护工程注浆效果的雷达检测[J]. 上海地质,2007( 1) : 75 -78.
Chen Jun, Zhao Yonghui, Wang Yongqiang, etc. Inspection on the Grouting Effect of one Protection Engineering of Foundation Pit by Means of Ground Penetrating Radar in Shanghai [J]. Shanghai Geology, 2007( 1) : 75 - 78.
[8] 于景村,李志聃. 高密度电阻率法检测地基注浆效果[J].地质与勘探,1998( 5) : 48 -51.
Yu Jingcun,Li Zhidan. The Hing Density Resistivity Mehtod Used For Detecting Foundation Grouting[J]. Geology and Prospecting,1998( 5) : 48 - 51.
[9] 董浩斌,王传雷. 高密度电法的发展与应用[J]. 地学前缘,2003( 1) : 171 -176.
Dong Haobin, Wang Chuanlei. Development and Applicationg of 2D Resistivity Imaging Surveys [J]. Earth Science Frontiers,2003( 1) : 171 - 176.
[10] Loke M H,Barker R D. Rapid Least Squares Inversion of Apparent Resistivity Pseudo Sections by Aquasi Newton method[J]. Geophysical Prospecting,1996( 7) : 73 - 81.
Loke M H,Barker R D. Rapid Least Squares Inversion of Apparent Resistivity Pseudo Sections by Aquasi Newton method[J]. Geophysical Prospecting,1996( 7) : 73 - 81.
[11] SASAKI Y. Resolution of Resistivity Tomography Inferred from Numerical Simulation[J]. Geophysical Prospecting,1996( 4) : 45 - 52.
|
|
|
|