Research on Several Problems in Designing the Short Tower Cable - stayed Bridge on Tianjin - Baoding Railway |
WU Da - hong,SONG Shun - chen,ZHANG Lei,XU Ping - wei |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300142,China |
|
|
Abstract Research purposes:In order to meet the needs of interchange and gain a good landscape effect,a ballasted short tower cable - stayed bridge with span arrangement of ( 84 + 56 + 32) m is adopted in the proposed Zi Yahe super major bridge on Tianjin - Baoding railway when crossing the flyover bridge in Xi Qingdao Street in the outer ring of Tianjin and the surrounding river. In order to get a reasonable design in mechanics and a good landscape effect,the paper mainly focuses on the optimization and selection of the key characters of the cable - stayed bridge such as structure system,structural dimensions,bearing layout plan,the cable anchorage system and so on.
Research conclusions: (1) The structure system of tower pier and beam consolidation was selected.The advantage of this scheme is its bigger stiffness and better overall performance.(2) By adding a connection pier,the overall stiffness of the structure increased by 20% ,and the dimensions of the cables reduced by 16% . After a comprehensive comparison,an auxiliary pier is added on the large mileage side. ( 3) When structural dimensions of the main beam were optimizaed and selected,the scheme 8 has the best performance and is recommended for this bridge.(4) After a comprehensive comparison,the transverse two - support system plan is selected.(5) The wire pipe saddle is recommended for the bridge because it has more advantages and is more suitable for the requirements of high - speed railway bridge.
|
Received: 21 May 2012
|
|
|
|
|
[1]陈亨锦,王凯,李承根.浅谈部分斜拉桥[J].桥梁建设, 2002( 1) : 44-47.
Chen Hengjin,Wang Kai,Li Chenggen. Preliminary Analysis of Partial Cable - stayed Bridge[J].Bridge Construction,2002( 1) : 44-47.
[2]王召祜.青藏铁路拉萨河特大桥方案设计[J].桥梁建设, 2005(5) : 1-3.
Wang Zhaohu.Conceptual Design of River Bridge on Qinghai - Tibet Railway[J].Bridge Construction,2005 (5) :1-3.
[3]李凤芹,王祯.拉萨河特大桥主桥结构设计[J].桥梁建设,2005(5) :8-12.
Li Fengqin,Wang Zhen.Structural Design of Main Bridge of Lhasa River Bridge[J].Bridge Construction, 2005(5) : 8-12.
[4]何新平.矮塔斜拉桥的设计[J].公路交通科技,2004 (4) :66-68.
He Xinping.Design of Low Tower Cable - stayed Bridge[J].Journal of Highway and Transportation Research and Decelopment,2004(4) : 66-68.
[5]刘峰民.大跨度 Pc 矮塔斜拉桥设计参数研究[D].西安: 长安大学,2006.
Liu Fengmin.Design Paremeter Research on Long - span PC Short Tower Cable - stayed Bridge [D].Xi’ an: Chang’an University,2006.
[6]郑一峰,黄侨,张连振.部分斜拉桥结构对比分析[J]. 公路,2005(11) :15-20.
Zheng Yifeng,Huang Qiao,Zhang Lianzhen. Comparative Analysis of Extradosed Bridge Structures [J].Highway,2005(11) :15-20.
[7]刘凤奎,蔺鹏臻,孙红红.矮塔斜拉桥塔高优化[J].铁道工程学报,2003(4) :71-74.
Liu Fengkui,Rui Pengzhen,Sun Honghong.PyIon Height Optimization for Short Tower Cable - stayed Bridge[J].Journal of Railway Engineering Society, 2003(4) : 71-74.
[8]周瑛琦.大跨度斜拉桥索梁锚固区的受力分析研究[J].浙江交通科技,2005(3) :35-36.
Zhou Yingqi.Mechanical Analysis and Research on Cable - Girder Anchorage Zone for Long - span Cable - stayed Bridge[J].Journal of Zhejiang Transportation Research and Decelopment,2005(3) : 35-36.
[9]李晓莉,肖汝诚. 矮塔斜拉桥的力学行为分析与设计实践[J].结构工程师,2005(4) :7-9.
Li Xiaoli,Xiao Rucheng. Mechanical Action Analysis and Design Practice of Short Tower Cable - stayed Bridge [J]. Structral Engineers,2005(4) : 7-9.
[10]张多平,康炜.兰州市小西湖黄河大桥设计分析[J]. 兰州铁道学院学报( 自然科学版) ,2002(6) :69-72.
Zhang Duoping, Kang Wei. Design Analysis on Xiaoxihu yellow River Bridge in Lanzhou City[J]. Journal of Lanzhou Railway Institute ( Natural Science Edition) ,2002(6) : 69-72.
|
|
|
|