[6] 中铁第四勘察设计院集团有限公司. 武广高速铁路软岩改良土填料现场填筑成套技术试验研究总报告[R]. 武汉: 中铁第四勘察设计院集团有限公司, 2009.
China Railway Siyuan Survey and Design Group Co.Ltd. General Report of Experimental Research on System Construction Technology of Improved Weathered Soft Rock on Wuhan - Guangzhou High -speed Rail [R]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2009.
[7] 孙常新,梁波,杨泉. 秦沈客运专线路基动应力响应分析[J]. 兰州交通大学学报, 2003( 4) : 110 - 112.
Sun Xinchang,Liang Bo,Yang Quan. Test and Analysis for the Dynamic Stress Responses of the Qin - Shen Railway' s Subgrade[J]. Journal of Lanzhou Railway University( Natural Scieuces) , 2003( 4) : 110 - 112.
[8] 中铁第四勘察设计院集团有限公司. 无砟轨道过渡段路基的变形控制技术及施工工艺的试验研究总报告[R].武汉: 中铁第四勘察设计院集团有限公司, 2009.
China Railway Siyuan Survey and Design Group Co.Ltd. General report of Experimental Research on Deformation Control and Construction Technology of Transition Section under Ballastless Track [R].Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2009.
[9] 邬强. 武广高铁红载土路堑基床动响应现场测试与分析[J]. 铁道工程学报, 2011( 8) : 47 - 52.
Wu Qiang. In - situ Test and Analysis of Dynamic Responses of Red Clay Cutting Bedding of Wuhan—Guangzhou Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2011( 8) : 47 - 52.