|
|
Application of Self - locking Fender Pile in Deep Water Foundation |
WANG Bing - yong |
Northwest Research Institute Co. Ltd of China Railway Engineering Corporation,Lanzhou,Gansu 730000,China |
|
|
Abstract Research purposes: For the problem of the deep water foundation encountered in construction of the Yellow River bridges in Lanzhou area,this paper discusses taking what kind of the measures that can safeguard the excavation and waterproof of the deep foundation,analyzes the applied conditions,advantages and disadvantages of of the various engineering measures taken for the similar projects in the past,and offers a though of taking the self - locking boring nest pile as the protection structure of the foundation.
Research conclusions: As a new type of foundation protection structure,it makes the full use of the geological conditions to take the reinforced concrete pile as the vertical support beam,and uses the level bound of the foundation rock on the pile bottom end and the level bound on the periphery beam of the fore shaft on the pile top end to form a stable self -locking support system to avoid making the support system in every steps during the foundation excavation. The plain concrete pile and reinforced concrete pile are nested to form a water - stop curtain to fully stop the water that is not achieved by the boring piles. In this way,the boring cast pile is used as the support structure and at the same time as the water - stop curtain to overcome the problems of the poor waterproof property and low safety,and at the same time it effectively cuts the construction cost.
|
Received: 14 December 2011
|
|
|
|
|
[1] 任伟. 黄河特大桥水中桩基双护筒成孔施工技术[J]. 山西建筑, 2007( 27) : 154 - 156.
Ren Wei. Pore - forming Technique of Yellow River XL Bridge Water Pile Foundation[J]. Shanxi Construction Engineering,2007( 27) : 154 - 156.
[2] 陈立成,等. 钻孔嵌套桩: 中国, 201020532115. 2[P]. 2011 -03 - 16.
Lichen Chen, etc. Bored Nested Pile: China,201020532115. 2[P]. 2011 - 03 - 16.
[3] 罗照新,等. 深基坑支挡加固防渗止水复合构造: 中国,200810147961. X[P]. 2011 - 03 - 30.
Luo Zhaoxin. Deep Foundation Retaining Strengthens and Waterproof Structure: China,200810147961. X[P]. 2011 - 03 - 30.
[4] 周心培. 挖孔桩围护墙在工程中的应用[J]. 铁道工程学报, 1997( 1) : 169 - 173.
Zhou Xinpei. Bored Pile Applications in Engineering[J]. Journal of Railway Engineering Society,1997( 1) :169 - 173.
[5] TZ 322—2010,铁路桥梁钻孔桩施工技术指南[S].
TZ 322—2010, Technical Guide of Bored Pile in Railroad Bridge[S]
|
|
|
|