The Design and Overhaul for Mast with Three - cantilever Suspension in Built Railway |
YANG JIA |
China Railway Eryuan Engineering Group Co,Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: Research purpose: In china,Three - cantilever suspension installed on solo Prestressed concrete pole with acrossed - webmember is widely used in station throat area in the passenger and cargo railway with the speed of 200km/h and below. When the railway system is under operation,the overhead contact system needs overhaul or replacement in time. However,the construction method of replacing traditional cantilever insulator cannot satisfy the special requirement of the three - cantilever suspension system,which may cause cracking mast,distorting mast, rupturing mast and so on,even more serious accident in overhead contact system. This paper calculates and analyses the design selection and construction process of the three - cantilever mast in order to provide the basis for safe operation and maintenance in the overhead contact system.
Research conclusions: ( 1 ) the Increased attached load during construction and Maintenance must be taken into consideration fully and comprehensively,when choosing the mast type in design. ( 2 ) During construction and Maintenance,the reasonable construction method could avoid increasing attached load in overhead contact system. ( 3) Two more reasonable methods of replacing cantilever insulator in mast with three - cantilever suspension are provided. Fir post is used to uninstall and change process. OCS overhaul working cart is used to uninstall and change process.
|
Received: 20 December 2011
|
|
|
|
|
[1] 于万聚. 高速电气化铁路接触网[M]. 成都: 西南交通大学出版社, 2002.
Yu Wanju. The Overhead Contact System of High - speed Electrified Railway [M]. Chengdu: Southwest Jiao tong University Press, 2002.
[2] TB 10009—2005 /J 452—2005,铁路电力牵引供电设计规范[S].
TB 10009—2005 /J 452—2005,Design Code of Railway Electric Traction Feeding[S].
[3] GB 50009—2001,建筑结构荷载规范( 2006 年版) [S].
GB 50009—2001,Load Code for the Design of Building Structures( 2006) [S]
[4] TB/T 2286—2003,电力化铁道横腹杆式预应力混凝土支柱[S].
TB/T 2286—2003,Prestressed Concrete Pole with Acrossed - webmember for Electrification Railway[S].
[5] 黄双胜. 既有电气化铁路接触网改造过渡工程施工工法[J]. 铁道工程学报, 2003( 4) : 105 - 110.
Huang Shuangsheng. Construction Technique for Transition Project of Overhead Contact Line on Existing Electrified Railway[J]. Journal of Railway Engineering Society, 2003( 4) : 105 - 110.
[6] 铁运[2007]69 号,接触网运行检修规程[S].
Railway Transportation [2007]No. 69,Maintenance Regulation for Overhead Contact System[S].
[7] Kieling,Pushmann,Schmieder. 电气化铁道接触网[M]. 北京: 中国电力出版社, 2004.
Kieling,Pushmann,Schmieder. The Overhead Contact System of Electrified Railway [M]. Beijing: China Electric Power Press, 2004.
|
|
|
|