铁道工程学报  2012, Vol. 29 Issue (5): 45-48    DOI:
Current Issue | Archive | Adv Search |
Safe Construction Techniques for Tunnels Passing through Fractured Fault Zone
GONG Cheng - ming1,MENG Qing - yu2,LI Wu - hong3
1. Projects Management Center,Ministry of Railways ,Beijing 100844,China; 2. The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251; 3. China Railway 12th Bureau Group Co. Ltd,Taiyuan,Shanxi 030024,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech