Ma Zhongzheng,Ma Xianfeng,Xu Qianwei,etc. Study on Pile Underpinning and Removing Technology of Shield Machine Crossing through Pile Foundations of Road Bridge [J]. Chinese Journal of Underground Space and Engineering,2010( 1) : 60 - 64.
[2] 孟庆军. 成都地铁河中桥梁桩基托换施工技术[J]. 隧道建设,2011( 1) : 31 -34.
Meng Qingjun. Construction Technology of Underpinning of Pile Foundations in Water: a Case in Construction of Chengdu Metro [ J ]. Tunnel Construction,2011( 1) : 31 - 34.
[3] 王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥: 安徽教育出版社,2005.
Wang Mengshu. Construction Method of Undercutting under Shallow Overburden for Underground Works [M]. Hefei: Anhui Education Press,2005.
[4] 刘建卫. 盾构穿越城市建( 构) 筑物桩基的施工技术研究[J]. 铁道标准设计,2010( 2) : 56 -60.
Liu Jianwei. Construction Technology for Shielding Passing through Pile Foundation of Urban Buildings [J]. Railway Standard Design,2010( 2) : 56 -60.
[5] 辛振省. 盾构隧道近距离穿越桥墩桩基的力学行为研究[J]. 铁道工程学报,2008( 5) : 72 -75.
Xin Zhenxing. Research on the Mechanical Behavior of Construction of Shield Excavating through the Approaching Pile Foundation of Pier[J]. Journal of Railway Engineering Society,2008( 5) : 72 - 75.
[6] 杨晓杰,邓飞皇,聂雯,等. 地铁隧道近距穿越施工对桩基承载力的影响研究[J]. 岩石力学与工程学报,2006 ( 6) : 1290 -1295.
Yang Xiaojie,Deng Feihuang,Nie Wen,etc. Study on Effect of Metro Unnelling on Carrying Capacity of Pile Foundation[J]. Chinese Journal of Rock Mechanics and Engineering,2006( 6) : 1290 - 1295.
[7] 涂强. 大轴力桩基托换变形控制值确定[J]. 铁道工程学报,2008( 2) : 26 -30.
Tu Qiang. Estimation of Deformation Control for Large Axial Force Pile Foun2dation Underp Inning [J]. Journal of Railway Engineering Society,2008( 2) : 26 -30