Research and Application of Method for Retesting CPⅢ Control Network During Operation and Maintenance Stages of High-speed Railway |
REN Xiao-chun, ZHOU Dong-wei |
China Railway First Survey and Design Institute Group Ltd, Xi'an, Shanxi 710043, China |
|
|
Abstract Research purposes: As the control datum for checking and adjusting the railway track of high-speed railway during the operation and maintenance stages, the CPⅢ track control network needs to be retested regularly within four hours of maintenance window time at night. With the retesting method stipulated in the current code for the CPⅢ , it has to be co-tested with the control points of the higher rank section by section. In this way, there are lots of retesting works to be done and the retesting efficiency is low. So it is very important to develop a retesting method and work out a kind of standard for judging the stability of the control point for retesting the CPⅢ during the operation and maintenance stages of high-speed railway.
Research conclusions: (1) By simulation calculation, the recommended values of the limit error of lateral and longitudinal chord lengths were determined and they were separately 1 mm and 2 mm. With these data, the verified tests were done for judging the stability of the retesting control points. The judging method was as follows: When the limit error of the lateral chord length between the adjacent control points of CPⅢ did not exceed the limit of 1 mm, it showed that at least the stability of one control points was poor. For further confirming the stability, it needed to see whether the limit error between the longitudinal chords lengths of these two control points and their adjacent CPⅢ points exceed the limit of 2 mm or not. (2) The testing results showed that the conclusions obtained by using the method presented in this paper were consistent with that obtained by using the methods stipulated in the current codes, so this method was feasible and the research result could provide the reference to working out and improving the specifications for retesting CPⅢ.
|
Received: 06 October 2012
|
|
|
|
|
[1] TB 10601—2009,高速铁路工程测量规范[S]. TB 10601—2009, Code for Engineering Survey of High Speed Railway [S].
[2] 铁建设 [2009] 20号,关于进一步规范铁路工程测量控制网管理工作的通知[S]. Railway Construction [2009] No.20, A Notification on the Further Regulate Survey Control Network of Railway [S].
[3] 运基线路[2010] 554号,高速铁路运营沉降监测管理办法[S]. Railway Transportation Infrastructure [2010] No.554, Subsidence Monitoring Measures at Operating and Maintenance Stage for High-speed Railway [S].
[4] 康高亮.高速铁路工务运营维护与管理[J].中国铁路, 2010(12): 29-33. Kang Gaoliang. Track Maintenance and Management for High Speed Railway [J]. Chinese Railways, 2010(12): 29-33.
[5] 武汉大学测绘学院测量平差学科组.误差理论与测量平差基础[M].武汉:武汉大学出版社,2003. Subject Group of Surveying Adjustment, School of Geodesy and Geomatics, Wuhan University. Theory of Errors and Basis of Surveying Adjustment [M]. Wuhan: Wuhan University Press, 2003.
[6] 徐小左,刘成龙,杨友涛.无砟轨道精调中CPIII网点稳定性检测方法的研究[J].铁道工程学报,2008(9): 21-22. Xu Xiaozuo, Liu Chenglong, Yang Youtao. Research on the Detection Method of CPm Points Stability in Fine Adjustment of Ballastless track [J]. Journal of Railway Engineering Society, 2008(9): 21-22.
[7] 王国昌,徐小左,刘成龙.高速铁路CPIII平面网的闭合差研究及其应用[J].铁道学报, 2009(10): 79-83. Wang Guochang, Xu Xiaozuo, Liu Chenglong. Research and Application of Closure for High Speed Railway CPm Plane Network [J]. Journal of the China Railway Society, 2009(10): 79-83.
[8] 彭仪普,许曦,杨文雅.客运专线无碴轨道精密定轨测量技术研究[J].铁道科学与工程学报,2007(6): 78-82. Peng Yipu, Xu Xi, Yang Wenya. Precisely Survey for Ballastless Track in the Passenger Dedicated Railway Line [J]. Journal of Railway Science and Engineering, 2007(6): 78-82.
|
|
|
|