Abstract Research purposes: At present,the fatigue performance research of lightweight aggregate concrete headed stud connectors is very few At home and abroad. Therefore,designing a set of lightweight aggregate concretes headed stud connectors push - out specimens, and fatigue tests are carried out. By fitting experimental data processing, the fatigue Ultimate strength, fatigue curve is obtained . Then compared with the related specifications and the gained achievements,to evaluate the fatigue resistance of specimens. The result of research also can provide the basis for the lightweight aggregate concrete on Steel - Concrete Composite Beam of bridge.
Research conclusions :(1) The test results show that the fatigue strength of lightweight aggregate concrete stud connectors guaranteed rate of 50% and 97. 72% is respectively 126. 7,105. 5 MPa. The difference between the results and other related research results on ordinary concrete stud connectors is little, and is higher than the corresponding standard value of the Eurocode 4. (2 ) The fatigue curve and fatigue failure mode with ordinary concrete headed stud connectors are similar,indicating that the lightweight aggregate concrete used in the shear stud connectors is feasible. (3) The research results can be popularized in similar engineering,such as composite beam bridge and so on.
|
Received: 28 November 2012
|
|
|
|
|
[1 ] European Committee for Standardization. Eurocode 4 : Design of Composite Steel and Concrete Structures, Partl. I : General Rules and Rules for Buildings [ S ]. European Committee for Standardization,1994.
[2]崔玉萍.钢-混凝土组合梁疲劳问题概述[J].市政技术,2004(1) :6 -13.
Cui Yuping. Summary on Fatigue Problems of Steel Concrete Composite Girder [ J ]. Municipal Engineering Technology,2004(1) :6-13.
[3]侯文崎,叶梅新.桁梁结合梁栓钉疲劳承载力的试验研究[J].长沙铁道学院报,1999(4) :46 -50.
Hou Wenqi,Ye Meixing. The Experimental Study on the Fatigue Bearing Capacity of the Steel - Concrete Composite Truss Girder Stand [ J]. Journal of Changsha Railway University,1999(4) :46 -50.
[4]车惠民,何广汉.部分预应力混凝土板梁的疲劳试验 [].铁道工程学报,1988(2) :19 -26.
Che Huimin,He Guang - han. Partial Prestressed Concrete Slab Beam Fatigue Test [ J ]. Journal of Railway Engineering Society ,1988(2) :19 -26.
[5]郑州工学院.钢-混凝土栓钉连接件压型钢板组合梁动载疲劳性能试验研究[R].郑州:郑州工学院,1990.
Zhengzhou Engineering Institute. Fatigue Tests on the Studs in the Profiled Steel Sheet - concrete Composite Beam[ R]. Zhengzhou Engineering Institute,1990.
[6]杨涛.钢-混凝土组合梁疲劳性能研究进展[J].河北工程大学学报(自然科学版),2010(1):16 -20.
Yang Tao. Advances in Fatigue Performance of Steel - concrete Composite Beams [ J ]. Journal of Hebei University of Engineering ( Natural Science Edition), 2010(1) :16-20.
[7] Slntter R G,Fisher J W. Fatigue Strength of Shear Connectors [ R ]. Highway Research Record No. 147, 1966:65 -68.
[8 ] S. AKAO,A. KURITA. Concrete Placing and Fatigue of Shear Studs [ C ]//Fatigue of Steel and Concrete Structures,IABSE Colloquium Lausanne, 1982.
[9] JOHNSON R P,Resistance of Stud Shear Connectors to Fatigue[ J]. Journal of Constructional Steel Research, 2000(56) :101 -116.
[10] Hirokazu Hiragi, Shigeyuku Matsui,Y Fukumoto. Static and Fatigue Strength of Studs [ C ] //International Association for Bridge and Structural Engineering, Labse Symposium Bmssels ,1990(60) :197 -202.
[11]聂建国,王宇航.钢-混凝土组合梁疲劳性能研究综述 [J].工程力学,20 12(6) : 1 -1 0.
Nie Jianguo,Wang Yuhang. Research Status on Fatigue Behavior of Steel - concrete Composite Beams [ J ]. Engineering Mechanics,2012(6) :1 -10.
|
|
|
|