Analysis of the Key Technology for Ground Temperature Test in Geothermal Investigation |
LIU Zheng-Ping |
China Railway First Survey and Design Institute Group Co. Ltd,Xi’an,Shanxi 710043,China |
|
|
Abstract Research purposes: In the YarluZangbujiang Canyon, the Semai-Renbu section of Lhasa-Rikaze railway goes near vertically across the hydrothermal active belt of Naqu-Yangbajing-Nimu. In the engineering geologic investigation for railway tunnel of geothermal region, we use the ground-temperature test method in drilling-hole to evaluate the geothermal conditions. This paper summarizes and studies on its geothermal test' s key technology.
Research conclusions(1)In the geologic investigation of Lhasa-Rikaze railway, the key technology of ground temperature test mainly includes: sensor for ground-temperature measuring, drilling- hole,the hole structure,test time and data processing. (2)It is suitable that the thermostat was choose as the sensor for ground-temperature test, with high precision,simple operation,well repeated use.(3)Pay attention to the hole deviation control in the process of drilling. Put the temperature tube in the drilling-hole , so that the temperature measuring cable can be repeated used. The temperature test time should be 30 days after the drilling. ( 4 ) The data processing about ground temperature mainly includes: determining depth of constant temperature layer, calculating the ground heat flux,forecasting the tunnel temperature,etc. ( 5)The results of this study can provide the basis and reference for geothermal ground temperature measuring of similar region, have certain reference significance to the geothermal investigation and geothermal research.
|
Received: 06 January 2014
|
|
|
|
|
[1]中铁第-勘察设计院集团有限公司.新建铁路拉萨至日喀则线初步设计总说明书[R].西安:中铁第-勘察设计院集团有限公司,2010.
China Railway First Survey and Design Institute Group Co. Ltd. General Specifications for Preliminary Design of Lhasa-Rikaze Railway[R].Xi' an ; China Railway First Survey and Design Institute Group Co. Ltd,2010.
[2] TB 10027-2012,铁路工程不良地质勘察规程[S].
TB 10027-2012 , Code for Unfavorable Geological Condition Investigation of Railway Engineering [ S ].
[3]刘继民,沈颖,赵淑萍.高精度热敏电阻温度传感器的技术改进及使用特点[J]冰川冻土,2011(4);765-771.
Liu Jimin, Shen Y'mg, Zhao Shaping. High-Precision Theruistor
[4]TB 10014-2012,铁路工程地质钻探规程[S].
TB 10014--2012 , Code for Geological Drilling of Railway Engineering [ S ].
[5]刘争平.多年冻土区地温测试关键技术研究[J].铁道工 程学报,2009(2):35-38.
Liu Zhengping. Study on the Technology for Ground Temperature Test in Permafrost Region [ J ].Journal of Railway Engineering Society , 2009 ( 2 ) ; 35-38.
[6〕徐世光,郭远生.地热学基础[M].北京:科学出版社, 2009.
Xu Shiguang , Guo Yuansheng. Basic Geothermic [ M ]. Beijing; Science Press,2009.
[ 7 ] DZ/T 0225-2009,浅层地热能勘查评价规范[S].
DZ/T 0225 2009 , Specification for Shallow Geothermal Energy Investigation and Evaluation[S].
[8] GB/T 11615-2010,地热资源地质勘查规范[S].
GB/T 11615-2010, Geologic Exploration Standard of Geothermal Resources [ S ] .
[9」田廷山,李明朗,白冶.中国地热资源及开发利用[M]. 北京:中国环境科学出版社,2006.
Tian lyngshan, Li Minglang, Bai Ye. The Development and Utilization of Geothermal Resources in China [ M ] . China Environmental Science Press, 2006.
[ 10]李金城.拉日铁路地热隧道方案比选研究〔J].铁道工程 学报,2011(4);41-45.
Li Jincheng. Research on Location of Geothermic Tunnel of Lhasa-Rikaze Railway[J].Journal of Railway Engineering Society , 2011( 4 ) ; 41-45.
[11〕DZ 40-85,地热资源评价方法[S].
DZ 40-85,Geothermal Resources Evaluation Method [S].
|
|
|
|