Abstract Research purposes: The gully region of the loess plateau winding up and down,the developed gulches, the deep valleys down to the third strata,all those elements make the upper covered loess unstable and form densely distributed large scale landslide area on loess plateau,which will be dangerous threaten to the operation safety of the Passenger Dedicated Line. By taking example of Baoji-Lanzhou Passenger Dedicated Line,this paper analyses the alignment schemes and illustrates how to escape the landslide group to ensure the railway construction and operation safety.
Research conclusions :(1)The schemes and engineering measures avoiding landslide vertically should base on plenty of detailed comprehensive geological survey and field investigation,which can greatly reduce the risk of tunnel construction and operation. ( 2)When the schemes and engineering measures avoiding landslide vertically are going to used for the new tunnel of the same kind,it should be taken into consideration that the length of the tunnel reverse slope should be shortened combined with the terrain,geological conditions, the lowest elevation of the tunnel should be heightened, waterproof and drainage problems should be resolved.(3)When the tunnel wear landslide,the full consideration should be taken into that the possibility of the landslide body above tunnel may slide due to instability under the action of the extreme weather, climate and other natural conditions. ( 4 ) This paper proposes for the first time to build tunnel in the gully region of the loess plateau by means of avoiding landslide vertically, will be very instructive for railway alignment and civil engineering construction in the similar terrain,geology,engineering conditions in the region.
|
Received: 06 January 2014
|
|
|
|
|
[1]TB 10621-2009,高速铁路设计规范(试行)[S].
TB 10621-2009,Code for Design of High-speed Railway ( Trial )[S].
[2]中铁第-勘察设计院集团有限公司.新建铁路宝鸡至兰州客运专线初步设计文件[R].西安:中铁第-勘察设计院集团有限公司,2010.
China Railway First Survey and Design Institute Group Co. Ltd. The Preliminary Design Documents of Baoji- Lanzhou Newly Built Passenger Dedicated Line[R]. Xi'an; China Railway First Survey and Demigod Instep Group Co. Ltd, 2010.
[3]中铁建协兰州分院.宝鸡至兰州客运专线黄土地区工程地质问题研讨会专家意见[R].兰州:中铁建协兰州分院,2010.
Lanzhou Branch of China Railway Construction Association. Experts' Advice of Loess Area Engineering Geology Workshop on Baoji-Lanzhou Newly Butt Passenger Dedicated Line[R].Lanzhou; Lanzhou Branch of China Railway Construction Association, 2010.
[4]卿三惠,黄润秋,杨英.滇藏铁路重大工程地质问题及线路走向研究[J].铁道工程学报,2007(10):6-11.
Qing Sanhui , Huang Runqiu , Yang Ying. Study on Major Engineering Geologcal Issues and Route of Yunnan-Tibet Railway [J].Journal of Railway Engineering Society, 2007 (10 ) ; 6-11.
|
|
|
|