Hu Guowei, Zhang Yuning, Zhang Junbing, etc.Research on the Space Stress - distribution Characteristics of Long - span and Complex Structure Bridge during the Whole Construction Process[J].Journal of Railway Engineering Society,2010( 3) : 43 -48.
[5] 焦宁艳. 阜阳泉河大桥V 形墩及0 号段施工技术[J]. 施工技术,2009( 5) : 61 - 79.
Jiao Ningyan. Construction Technology of V - shaped Piers and No. 0 Segment of Fuyang Quanhe Bridge[J].Construction Technology,2009( 5) : 61 - 79.
[6] 李英俊,胡国伟. V 型墩水平预应力索单端张拉工艺研究[J]. 科技情报开发与经济,2008( 5) : 208 - 209.
Li Yingjun,Hu Guowei. Research on Single - ended Stretching Technology of Horizontal Prestressed Cable of V - shape Pier[J]. The Development and Economy of Science Information,2008( 5) : 208 - 209.
[7] 王广建. 韩江特大桥深水V 型墩顶主梁0 号块支撑体系设计[J]. 铁道建筑技术,2009( 5) : 5 - 8.
Wang Guangjian. Support System Design of Hanjiang Extra - long Bridge V - type Pier Cap Main Beam 0#Block in Deep Water [J]. Railway Construction Technology,2009( 5) : 5 - 8.
[8] 潘寿东. 连续刚构桥V 型墩“平衡支架法”施工技术研究[J]. 石家庄铁道学院学报,2005( 4) : 100 - 104.
Pan Shoudong. Construction Technology of V - shaped Pier for Continuous Rigid Bridge with Balanced Trestle Method[J]. Journal of Shijiazhuang Railway Institute,2005( 4) : 100 - 104.
[9] 胡国伟,张宇宁,程文斌,等. 大跨度连续刚构桥V 型墩施工过程仿真技术研究与应用[J]. 中国铁路,2008( 5) :27 - 29.
Hu Guowei,Zhang Yuning,Cheng Wenbin,etc. Study and Application of Simulation Technology for V - Type Pier Construction Procedure in Large - span Continuous Rigid - frame Bridge[J]. Chinese Railways,2008( 5) : 27 - 29.
[10] 赵顺波,刘世明,杨竹林,等. V 型墩连续刚架桥的造型与结构方案设计研究[J]. 河南大学学报( 自然科学版) ,2010( 1) : 101 - 104.
Zhao Shunbo,Liu Shiming,Yang Zhulin,etc. Study on Design of Shape and Structural Project of Continuous Rigid - Framed Bridge with V - Shaped Piers[J].Journal of Henan University ( Natural Science) ,2010( 1) : 101 - 104.