He Zhenqi,Li Hai,Liang Yanzhong. Geological Super - leading Forecast During Tunnel Construction by Utilizing Seismic Response Analysis Method [J]. Journal of Railway Engineering Society,2000( 4) : 81 - 85.
[3] 肖书安,吴世林. 复杂地质条件下的隧道地质超前探测技术[J]. 工程地球物理学报,2004( 2) : 159 -165.
Xiao Shu ’ an, Wu Shilin. Geological Prediction Technique for Tunnel Construction under Complex Geological Conditions [J ]. Chinese Journal of Engineering Geophysics,2004( 2) : 159 - 165.
[4] 温树林,吴世林. TSP 203 在云南元磨高速公路隧道超前地质预报中的应用[J]. 地球物理学进展,2003: 465 - 471.
Wen Shulin,Wu Shilin. Application of the TSP 203 System in Geological Advanced Prediction of YuanMo Expressway Tunnel[J]. Progress In Geophysics,2003: 465 - 471.
[5] 陈建峰. 隧道施工地质超前预报技术比较[J]. 地下空间,2003( 1) : 5 -8.
Chen Jianfeng. Geological Prediction Technique Comparison of Tunnel Construction [J]. Underground Space,2003( 1) : 5 - 8.
[6] 王兴照. TSP 203 plus 超前地质预报在琯头岭隧道断层中的应用[J]. 福建建筑,2008( 5) : 44 -46.
Wang Xingzhao. Leading Geological Forecast of TSP 203 Plus Applied to the Fault Zone of Guan Tou Ling Tunnel[J]. Fujian Architecture & Construction,2008 ( 5) : 44 -46.
[7] 张志龙,王兰生,王跃飞,等. 雪峰山高速公路隧道 F2 断层带的综合超前地质预报[J]. 岩石力学与工程学报, 2007( S1) : 3311 - 3315.
Zhang Zhilong,Wang Lansheng,Wang Yuefei,etc. Comprehensive Advanced Geological Prediction of Fault F2 in Xuefeng Mountain Highway Tunnel [J]. Chinese Journal of Mechanics and Engineering,2007( S1) : 3311 - 3315.