Abstract Research purposes: It is of significance to detect secondary lining's defect of tunnels as well as to repair and strengthen the secondary lining. Radar was applied to detect lining's defect in Jiaoxiling tunnels. Direct stiffness method was used to study the influence of holes on the lining mechanics.
Research conclusions:Main defects of the secondary,holes lying behind the crown, and the next is seepage. The secondary lining mechanic is showed to be very complex and unfavorable due to holes. The weak parts locate the crown and middle of the arch. The first reason of lining defect is that construction had not adopted IVATM and had not caught the key design meaning. The next reason is that it is hard to fill the crown fully and densely. Some treatments are presented if the hole size lying behind the crown is very large to ensure the operation in safety.
|
Received: 28 July 2008
|
|
|
|
|
[1] 彭立敏,安永林,杨高尚.隧道火灾调研及其对雪峰山隧 道防灾设计的启示[J].灾害学,2006,21(3):103-106
[2] 何川,佘键.隧道二次衬砌病害通用处治方法研究[J]. 中国铁道科学,2005,26(1) :25 -30.
[3] 杨峰,苏红旗.地质雷达技术及其在公路隧道质量检 测中的应用[J],筑路机械与施工机械化,2005(10): 8-10.
[4] 杨坤彪,杨勇.隧道工程质量无损检测的方法组合探讨 [J].工程勘察,2005 (1) :66-69.
[5]覃建波,邓世坤,李沫.探地雷达在隧道和涵洞工程检测 中的应用研究[J].煤田物探,2004(5):10-13.
[6]陈礼伟.地质雷达检测隧道衬砌质量中的问题研究[J]. 岩土力学,2003,24(增):146-149.
[7]冯慧民.地质雷达在隧道检测中的应用[J].现代隧道 技术,2004,41(4) :67-71.
[8]司徒丽新,邹友泉.衬砌背后空洞对于公路隧道的危害 性研究[J].山西建筑,2007,33(31):301-302.
|
|
|
|