铁道工程学报  2010, Vol. 27 Issue (10): 36-40    DOI:
Current Issue | Archive | Adv Search |
Discussion on Calculation Method for Settlement of Pile-net Structure Subgrade
WEI Yong—xing,XUE Xin—hua
China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Siehuan 610031,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech