Deformation Effect Caused by Gauss Projection on Track Design of High—speed Railway |
MEI Ⅺ |
China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: The engineering survey plane coordinate system for high—speed railway adopts engineering independent coordinate system and the projective way is gauss projection in China.Normally,the plane coordinate system for high—speed railway is divided into some subdivisions of projection,SO that the deformation value of the projected side length is not more than 10mm/km.It is known that the angle will be indechnable after conducting the gauss projection,but it was found that the angle of the adjacent projection division would be anamorphic after conducting gauss projection in the track design of high—speed railway.So it is necessary to research the effect of this problem on the track design of high—speed railway to give the corresponding solutions and suggestions to this problem.
Research conclusions: The angle deformation will appear when gauss projection is used in coordinate projection division of the different central meridians,which has a negative impact on the tack design of high—speed railway.Especially when the rectilineal side of high—speed milway is very long,this negative impact Call not be ignored.This impact on the track design of high—speed railway should be reduced by some ways,such as optimizing the position of the subdivision of projection of engineering independent coordinate and controlling the deformation sizes of the central meridian span and angle of adjacent gauss projection divisions.And also it is necessary to research the projection model and calculation method for the engineering survey to achieve the goal that only one projection division is used in a engineering project or fewer divisions are used in one engineering project
|
Received: 01 August 2010
|
|
|
|
|
[1] TB 10601-2009,高速铁路工程测量规范[S].
TB 10601-2009, Code for Engineering Survey of High Speed Railway[S].
[2] J 962-2009,高速铁路工程测量规范[S].
J 962-2009, Code for Engineering Survey of High Speed Railway[S].
[3] TB 10101-2009,铁路工程测量规范[S].
TB 10101-2009, Code for Railway Engineering Survey [S].
[4] J 961-2009,铁路工程测量规范[S].
J 961-2009, Code for Railway Engineering Survey[S].
[5] 孔祥元,梅是义.控制测量学[M ].武汉:武汉大学出版 社, 2006.
Kong Xiangyuan,Mei Shiyi. Control Surveying Course [M ].Wuhan:Wuhan University Press, 2006.
[6] 边少锋,柴洪洲,金际航.大地坐标系与大地基准[M ].北 京:国防工业出版社, 2005.
Bian Shaofeng, Chai Hongzhou, Jin Jihang. Geodetic Coordinate System and Geodetic Datum [M ] . Beijing: National Defense Industry Press, 2005.
[7] 程昂,卢建康.5新建铁路工程测量规范6修订原则及技 术特点[J].铁道工程学报, 2009(8): 10 -15.
Cheng Ang, Lu Jiankang. Revise Principles and Technical Characteristics of Code for the Engineering Survey for New Railway[ J ]. Journal of Railway Engineering Society, 2009(8): 10 -15.
[8] 卢建康.论我国高速铁路精密工程测量技术体系及特点 [J].高速铁路技术, 2010(1): 31 -35.
Lu Jiankang.On Precise Engineering Survey Technology System and Characteristic for High Speed Railway in China [J]. High Speed Railway Technology, 2010(1): 31 -35.
[9] 梅熙.GPS技术建立铁路客运专线平面控制网若干问题 探讨[J].铁道勘察, 2005(5): 3 -7.
Mei Xi. Exploration for Some Issues on Setting up the Flat Control Net for Passenger -Dedicated Railway Lines with GPS Technology [J]. Railway Investigation and Surveying, 2005(5): 3 -7.
|
|
|
|