Abstract Research purposes:It is very difficult to do the construction organization work for construction of the turn-back track from Jinsong Station to the terminal station of Line 8 of Beijing metro due to the manifold styles of structures, unfavorable engineering and hydraulic geological conditions, many ground buildings and underground pipelines. In this paper, the analyses of key points and difficult points in construction of the track are made and the solutions are presented to the technical problems in design and construction of the turn-back track of metro in the area of the Quaternary stratum.
Research conclusions: If the metro is built in the area of the Quaternary stratum, the attention should be paid to solving the difference of cross-sections, reducing the transitions, pre-reinforcing the soil mass in the middle part and taking the different measures for protection of the buildings in design. The radiation well should be used along with draining water in tunnel for draining water if there is no condition for building pipe well on ground. At the same time, the construction should be conducted according to the construction procedure for shallow tunnel for overcoming the technical problems in construction and assuring the construction quality.
|
Received: 06 August 2009
|
|
|
|
|
[ 1 ] 王海祥. 北京地铁十号线一期(含奥运支线)工程劲松站—终点区间施工图设计[Z]. 西安:铁道第一勘察设计院, 2006.
Wang Haixiang. The Working Design of Beijing Subway Line No.10 Part 1 ( Include Olympic Branch) from Jinsong to Terminal[Z]. Xi’an: China Railway First Survey and Design Institute Group Ltd. , 2006.
[ 2 ] 陈建, 等. 北京地铁十号线一期(含奥运支线)工程18标实施性施工组织设计[Z]. 北京:中铁十六局集团有限公司, 2004.
Chen Jian, etc. Construction Implement Design of Beijing Subway Line No.10 Part 1 ( Include Olympic Branch)[Z]. Beijing: China Railway 16th Group Co. Ltd. , 2004.
[ 3 ] 北京市地质工程勘察院. 北京地铁十号线一期(含奥运支线)工程劲松站—终点区间降水工程施工设计[Z]. 北京:北京市地质工程勘察院, 2005.
Beijing Survey Institute of Geological Engineering. The Dewatering Design of Beijing Subway Line No.10 Part 1 ( Include Olympic Branch) from Jinsong to Terminal[Z]. Beijing: Beijing Survey Institute of Geological Engineering, 2005.
[ 4 ] 王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥:安徽教育出版社, 2005.
Wang Mengshu. Theory of Underground Engineering Using Mining Method for Shallow Tunnels[M]. Hefei: Anhui Education Press, 2005.
[ 5 ] 孙均. 地下工程设计理论与实践[M]. 上海:上海科学技术出版社, 1996.
Sun Jun. Theory and Practice of Underground Engineering[M]. Shanghai: Shanghai Science and Technology Press, 1996.
[ 6 ] 关宝树. 隧道工程设计要点集[M]. 北京:人民交通出版社, 2003.
Guan Baoshu. The Key Po in ts of Tunnel Design[M]. Beijing: China Communications Press, 2003.
[ 7 ] 赵玉奎, 程炜. 城市地铁超大断面浅埋暗挖施工技术[J]. 都市快轨交通, 2002(3): 3-5.
Zhao Yukui, Cheng Wei. Mining Method for Shallow Tunnels in Large Cross-section Tunnel in City Subway[J]. Urban Rapid Rail Transit, 2002(3): 3-5.
[ 8 ] 苏晓峰. 小间距地铁隧道设计思路[J]. 铁道工程学报, 2008 (8): 89-92.
Su Xiaofeng. Discussion on the Design of Neighborhood Tunnels[J]. Journal of Railway Engineering Society, 2008(8): 89-92.
[ 9 ] 李文江, 贾晓云, 刘志春. 地铁区间大断面隧道施工力学行为研究[J]. 地下空间与工程学报, 2007(2): 40-43.
Li Wenjiang, Jia Xiaoyun, Liu Zhichun. Research on Construction Mechanical Behavior of Large Cross-section Tunnel in Subway Engineering[J]. Journal of Underground Space and Engineering, 2007(2): 40-43.
[ 10 ] 毕继红, 钟建辉, 丛蓉. 浅埋洞室围岩压力有限元分析[J]. 铁道工程学报, 2004 (4): 77-81.
Bi Jihong, Zhong Jianhui, Cong Rong. The Surrounding Rock Stress in Shallow Underground Openings[J]. Journal of Railway Engineering Society, 2004(4): 77-81.
|
|
|
|