|
|
Research on the Design Mode for African Highway Project |
CHEN Zhi-jun, LI Li, ZHANG Sheng-bin, XIAO Hong-jian |
The Second Highway Survey Design and Research Institute Co. Ltd. of China Communications, Wuhan, Hubei 430056, China |
|
|
Abstract Research purposes:Combined with the design mode for the No.1 National Highway in Congo(Brazzaville) , the discussion is made on the characteristics of design management system, the adoption of design standards and the role orientation of design in African highway projects, and the comparison is made between the overseas design patterns and the domestic design pattern for providing the reference to the design of the overseas highway project by Chinese designer.
Research conclusions:(1) The construction management system of general contracting design and construction is adopted in most of the African highway projects. (2) The European standards system is usually adopted in design of African highway projects with more detailed design stages. (3) The design mode for African highway more closely combined with the construction, with more detailed design content and more nitty-gritty design flow than China. (4) The design under condition of design and construction integration should consider all the factors of the construction condition and construction program and it is essential to the benefits maximization.
|
Received: 26 November 2009
|
|
|
|
|
[ 1 ] 陈智俊. 非洲公路项目建设管理体制特点. 铁道工程学报 , 2009 (5) : 94 - 97.
Chen Zhijun. Management System and Characteristics of African Highway Project. Journal of Railway Engineering Society, 2009(5) :94 - 97.
[ 2 ] SETRA. 公路设计指南 [ K]. 班雅尔 :法国道路和高速道路技术研究管理局 , 1994.
SETRA. Highway Design[K]. Bagneux: French Roads and High-speed Roads Research Board, 1994.
[ 3 ] BAEL91 révisé99, Fascicule N°62-Titre I - Section I[S].
[ 4 ] BAEL91 révisé99, Fascicule N°62-Titre I - Section Ⅱ[S].
[ 5 ] 李海明. 坦桑尼亚和赞比亚基础设施建筑市场及投资环境分析[ J ]. 铁道工程学报 , 2005 (2) : 70 - 75.
Li Haiming. Analysis of Construction Market of Infrastructure and Investment Environment in Tanzania and Zambia[J]. Journal of Railway Engineering Society, 2005(2) : 70 - 75.
[ 6 ] 重庆市政府非洲调研考察组. 对开拓非洲工程承包市场的探讨 [ J ]. 探索与研究 , 2006 (12) : 9 - 11.
Africa Research Expedition of Chongqing Government. To Explore the African Engineering Contracting Market[J]. Exploration and Research, 2006(12) : 9 - 11.
[ 7 ] 杨莹. 中国对非洲直接投资研究 [D ]. 哈尔滨 :东北林业大学 , 2007.
Yang Ying. Chinese Investment in Africa[D]. Haerbin: Northeast Forestry University, 2007.
[ 8 ] 汪恒 ,石京. 非洲公路现状及公路建设市场参入前景分析 [ J ]. 铁道工程学报 , 2008 (3) : 97 - 101.
Wang Heng, Shi Jing. Analyses of Present African Roads and Prospects for Access to African Roads Construction Market[J]. Journal of Railway Engineering Society, 2008(3) : 97 - 101.
[ 9 ] 赖寿鸿. 工程设计与施工一体化模式及工作程序 [ J ].公路交通技术 , 2006 (4) : 36 - 39.
Lai Shouhong. Project Engineering and Construction Integrated Mode and Work Procedures[J]. Technology of Highway and Transport, 2006(4) : 36 - 39.
[ 10 ] 秦骊远. 如何提高对外承包工程的经济效益 [ J ]. 经济实务 , 1994 (3) : 42 - 45.
Qin Liyuan. How to Improve the Economic Benefits of Foreign Contracted Projects[J]. Business Affairs, 1994(3):42-45.
|
|
|
|