Analysis of the Parameters Related to Determining the Midway between Tracks in High-speed Railway Passenger Station |
LIU Jian-guang |
China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes:The midway between tracks in station is one main technical parameters of station design. The design method is stipulated in the Design Code for the midway between tracks in station of the 200 km/h high-speed railway or above (passenger dedicated line), but the final parameters needed in the station design are not stipulated in the Design Code. This paper analyzes the parameters related to determining the midway between tracks in station of high-speed railway (passenger dedicated line) and offers the reference opinions on it based on the design practice.
Research conclusions:The midway between tracks in station is not only related to the facilities of catenary post, noise barrier and canopy column, but also related to the facilities of the structural column of elevated station building, anti-collision wall and longitudinal drainage between tracks. This paper gives data about midway between main line and receiving-departure tracks with or without column, and the midway between receiving-departure tracks respectively.
|
Received: 15 December 2008
|
|
|
|
|
[ 1 ] 铁建设[2007]47号, 新建时速300~350公里客运专线铁路设计暂行规定[S].
[ 2 ] GB 50091—2006,铁路车站及枢纽设计规范[S].
[ 3 ] GB 50090—2006,铁路线路设计规范[S].
[ 4 ] 铁建设[2005]140号,新建时速200~250公里客运专线铁路设计暂行规定[S].
[ 5 ] Hartmut Freystein. Martin Muncke德国铁路基础设施设计手册[M]. 北京: 中国铁道出版社, 2007.
|
|
|
|