Analysis and Study of a Fill Slope Site of Geological Disease in Loess Area |
YAO Wei1 , ZHANG Zhong-Ping1 , TAN Dong-sheng2 , DENG Ant2 |
1 .Northwest Research Institute Co. Ltd of C. R. E. C,Lanzhou,Gansu 730000,China; 2. Chengdu Surveying Geotechnical Research Institute Co. Ltd of MCC,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: In the loess area of fill slope site, if in the initial site leveling without effective treatment on soil,after site will appear a variety of geological diseases, the geological diseases in Lanzhou Berlin is a typical loess area of fill slope site. By analyzing the development mechanism of Lanzhou Berlin’s geological disaster, this paper proposes control measures,evaluates the control effect.
Research conclusions :(1)Lanzhou Berlin geological disease mainly is filling soil deformation along the old ground peristalsis,accompanied by uneven ground settlement. ( 2 ) The causes of diseases mainly field usually on the filling no effective treatment,coupled with the strong collapsibility, lead to ground surface crack,surface water area of infiltration,convergence in the soil the old ground contact zone,and then cause the surface deformation.(3)The infiltration of surface water is the main site of disease induced factors,so the project management must adhere to the ,,controlled drainage,retaining engineering subsidiary,foundation treatment after" principle,according to the field monitoring data, the project provided reasonable,control effect is obvious. ( 4 ) This paper points out that the filling of slope site must be processed effectively,to fill in the initial site leveling, otherwise no end of trouble for the future. (5)This paper similar loess soil has a certain reference significance for analysis and treatment of diseases of the slope site in the similar loess area.
|
Received: 26 October 2013
|
|
|
|
|
[1 ] DZ/T 0218-2006,滑坡防治工程勘查规范[S].
DZ/T 0218-2006,Specification Investigation for Landslide Stabilization [ S ].
[2]中铁西北科学研究院有限公司.兰州地质病害治理工程 勘察、设计文件[R].兰州:中铁西部科学研究院有限公 司,2010.
Northwest Research Institute Co.,Ltd. of CREC. Geological cal Disease Survey and Design Documents of Lanzhou [ R ].Lanzhou ; Northwest Research Institute Co.,Ltd. of CREC,2010.
[3]徐邦栋.滑坡分析与防治[M].北京:中国铁道出版社, 2001.
Xu Bangdong. Landslide Analysis and Prevention [ M ]. Beijing: China Railway Publishing House,2001.
[4」耿强,曹集士,巫锡勇.滑坡整治工程后评价分析[J]. 铁道工程学报,2011(3);9-13.
Geng Qiang, Cao Jishi, Wu Xiyong. Post-evaluation Analysis of Landslide Treatment[J].Journal of Railway Engineering Society , 2011( 3 ) ; 9-13.
[5]罗东海,吴玮江,王念秦,等.陇南市三家地黄土地震 滑坡形成机理研究[J].铁道工程学报,2012(3):17-21.
Luo Donghai,Wu Weijiang,Wang Nianqin, etc. Research on Formation Mechanism of Sanjiadi Loess Seismic Landslide in Longman City [J].Journal of Railway Engineering Society, 2012 ( 3 ) :17-21.
[6]宋响军.石忠高速公路K 22 + 000-+220段滑坡的性质 及防治对策[J].铁道工程学报,2011(7);42-47.
Song Xiangjun. Landside Characteristics and Control Countermeasures between K 22+000 ~ +220 Section along Shizhu-Zhongxian Highway[J].Journal of Railway Engineering Society , 2011( 7 ) ; 42-47.
[7]孙书伟,朱本珍,谭冬生.黄土地区管道沿线填土边坡 滑坡发生机理和防治对策[J].中国铁道科学,2008 (4) :8-14.
Sun Shuwei , Zhu Benzhen , Tan Dougsheng. Mechanism of Willing Slope Landslide along Pipeline in Loess Area and the Countermeasures [J].China Railway Science, 20(18 ( 4 ) ; 8-14.
|
|
|
|