The Geology and Mineral Resources Office of the Tibet Autonomous Region.The Status Quo of Geothermal Resources Development and Utilization and the Environmental Impact Survey Reports of Tibet Autonomous Region[R].Lhasa: The Geology and Mineral Resources Office of the Tibet Autonomous Region,2000.
[7] 铁道部第一勘测设计院. 铁路工程地质手册(修订版) [K].北京: 中国铁道出版社,1999.
The First Survey and Design Institute of Ministry of Railway.The Railway Engineering Geology Manual (Revision)[K].Beijing: China Railway Publishing House,1999.
[8] 铁道第一勘察设计院.新建铁路拉萨至日喀则线可行性研究报告[R].西安: 铁道第一勘察设计院,2006.
The First Survey and Design Institute of China Railway. The Feasibility Study Report of the Newly Built Railway from Lhasa to Xigaze[R].Xi’an: The First Survey and Design Institute of China Railway,2006.
[9] 铁道第一勘察设计院.新建铁路拉萨至日喀则线色麦至大竹卡峡谷地段断裂构造调查专题研究报告[R].西安: 铁道第一勘察设计院,2006.
The First Survey and Design Institute of China Railway. The Faults Investigation Special Report of the Se - mai to Da - zhu - ka Canyon Area Belonging to the Newly Built Railway from Lhasa to Xigaze[R].Xi’an: The First Survey and Design Institute of China Railway, 2006.
[10] 曹峰,范春林.综合地质勘察方法在甘塔斯隧道的应用实例[J]. 铁道工程学报,2011(8) :18-22.
Cao Feng,Fan Chunlin. Application of Comprehensive Geological Survey Methods in Construction of Ganntas Tunnel in Algeria[J]. Journal of Railway Engineering Society,2011(8) : 18-22.