Study on Plan for Rail way Upgrading in Zibo Area |
XU Wen-Fang,YAO Chuan-kai |
China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: The railway in Zibo area is of “十” type nub pattern at present. The through train coming from Jinan to the Zhangdong line has to pass the Zibo Railway Station,and the train from Jinan to the Jinlingzhen Station has to pass the Dujin connection track to form a angle transportation. It has impacted the traffic capacity of the Qingdao-Jinan Railway under condition of the increasing tension of the traffic capacity of the Zibo Station and Dongfeng Station. Therefore,how to eliminate the angle transportation,release the existing capacity and meet the growing needs for the freight transportation is a urgent problem to be solved.
Research conclusions: From the study on the existing railway pattern in Zibo area,it is concluded:(1)Based on the analysis of traffic organization,the operations of Zibo and Dongfengzhen station are redivided. The Zibo Station undertakes the operations of the trains from Jinan to the Zhangdong Line and Zhangbo Line via the Zibo Station and the Dongfeng Station undertakes the operations of the train from the Qingdao-Jinan Railway to the Zhangdong Line and Zhangbo Line. The train running mode is also adjusted. The operations of trains from Jinan to the Zhangdong Line is undertaken by the Jinan Xi Station and Duke Station to release the pressure on the Zibo and Dongfeng stations and avoid the angle transportation.(2)In order to adapt to the traffic organization optimization,the small modification was conducted to the Zibo Railway Station. Two shunting tracks were changed as arrival and departure tracks and the Qingdao throat zone was adjusted,so that all the arrival and departure tracks could be used for hump shuting and the effective length of the arrival and departure track became longer. By making such a small range transformation,the capacity of existing station was enhanced. ( 3)Based on the research,the tension situation of regional carrying capacity was released by making full use of the existing facilities and doing partial reconstruction of existing railway to reduce the interference on railway traffic. This research experience can provide the reference to the upgrading and reconstruction of the existing station.
|
Received: 12 March 2013
|
|
|
|
|
[1]GB 50090—2006,铁路线路设计规范[S]
GB 50090—2006, Code for Design of Railway [S].
[2]GB 50091—2006,铁路车站及枢纽设计规范[S]
GB 50091—2006,Code for Design of Railway Station and Terminal[S].
[3] 铁道第四勘察设计院.铁路工程设计技术手册?站场及枢纽[K].北京:中国铁道出版社,2004.
The Fourth Survey and Design Institute of China Railways. Railway Engineering Technical Manual- Station and Yard and Terminal [K].Beijing: China Railway Publishing House, 2004.
[4]李杰,姚传开.渝黔引人贵阳枢纽货车下线疏解方案研究[J].铁道工程学报,2013(6) : 69-72.
Li Jie, Yao Chuankai. Research on Untwining Plan for Freight Train of Chongqing-Guizhou Railway Accessing into Guiyang Hub [J].Journal of Railway Engineering Society, 2013 (6):69-72.
[5]杨丽华.新建贵广铁路引人都匀地区方案研究[J].铁道运输与经济,2009(5) : 30-32.
Yang Lihua. Study on Leading-in Scheme for Newly- built GuiGuang Railway in Duyun Area[J].Railway Transport and Economy , 2009 ( 5 ) : 30-32.
[6]包维民.十字交叉型客运站布置图型研究[J].铁道运输与经济,2007(增刊) : 31-35.
Bao Weimin. Study on Layout of Criss-crossing Passenger Station [J].Railway Transport and Economy, 2007 (S): 31-35.
[7]刘世峰.铁路接轨站设计应考虑的因素[J].铁道运输与经济,2007(增刊) : 58-60.
Liu Shifeng. Factors to Be Considered in Design of Railway Junction Sration [J].Railway Transport and Economy, 2007 (S): 58-60.
[8]中铁二院工程集团有限责任公司.改建铁路淄博站区扩能改造工程可行性研究[R].成都:中铁二院工程集团有限责任公司,2012.
China Railway Eryuan Engineering Group Co. Ltd. Feasibility Study for Expansion Renovation Project for Reconstructed Railway of Zibo Station Area[R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd ,2012.
|
|
|
|