Abstract Research purposes:The terrain and geological conditions of the southwest mountainous areas are complicated. It is inevitable that tunnel of high - speed railway has to under - pass river valley. So when the shallow tunnel under - passes river valley,there is a high risk to bring about a lot of technical problems in the design. Taking the design of Yanshan Tunnel of Guiyang - Guangzhou Railway under - passing the Bakuang River as the engineering background, this paper researches the key design technologies for the shallow tunnel under — passing the seasonal river valley.
Research conclusions:(1) When shallow tunnel under 一 passes seasonal river valley,the main risk comes from the huge ground water inflowing into the tunnel possibly to produce the water and mud bursting and the collapse of subsurface cut tunnel and make the tunnel lining structure floating. (2) The construction risk can be much cut and structure can be safe and reliable by adopting the door - type sealed structure system composed of the secant pile, top beam, anti 一floating board,grouting to the rock in the framework and fully sealed lining structure of tunnel. (3) The working order of sealing before excavation and the effective risk control plan can ensure the construction safety and control the construction risk. (4)This study result can provide the reference to the similar projects.
|
Received: 10 December 2012
|
|
|
|
|
[1]杨会军.浅埋暗挖大跨地铁风道施工技术[J].铁道工 程学报,2012 (1):83 -87.
Yang Huijun, Construction Technology for Shallow Surface Excavation Large - spanned Metro Air Duct.
[J] .Journal of Railway Engineering Society,2012(1): 83 -87. [2]来弘鹏,郑甲佳,谢永利.黄土地区浅埋暗挖地铁隧道 围岩压力特征研究[J].铁道学报,2012(3) :99-104.
Lai Hongpeng, Zheng Jiajia, Xie Yongli. Study on Characteristics of Surrounding Rock Pressure of Undercut Metro Tunnel with Shallow Buried Excavation in Loess Region [ J]. Journal of the China Railway Society, 2012(3): 99-104.
[3]王军生.咬合桩在既有线桥梁基础冲刷防护中的应用 [J].高速铁路技术,2012(3) :30 -33.
Wang Junsheng. Application of Secant Piles in Scour Protection of Bridge Foundation on Existing Railway Line[ J]? High Speed Railway Technology, 2012(3): 30 - 33.
[4]中铁二院工程集团有限公司.岩山隧道综合勘察成果报 告[R].成都:中铁二院工程集团有限公司,2009.
China Railway Eryuan Engineering Group Co. Ltd. Comprehensive survey results report, of Yanshan tunnle [R ] ? Chengdu : China Railway Eryuan Engineering Group Co. Ltd,2009.
[5]铁道部第二勘察设计院.铁路工程设计技术手册?隧道 [K].北京:中国铁道出版社,1995.
Second Survey and Design Institute of Railways. Railway Engineering Technical Manual ? Tunnle [K]. Beijing: China Railway Publishing House, 1995.
[6]TB 1_3—2005,铁路隧道设计规范[S].
TB 10003~2005,Code for Design on Tunnel of Railway [S].
[7]GB 50157—2003,地铁设计规范[S]
. GB 50157~2003,Code for Design of Metro [ S].
[8]阳习丰.浏阳河隧道过河段设计关键技术[J].铁道标 准设计,2008(4) :87-90.
Yang Xifeng. The Key Technologies of Liu Yang He Tunnel Design [J]. Railway Standard Design, 2008 (4) :87 - 90.
[9]贾志清.明挖隧道结构抗浮设计新思路[J].铁道建筑 技术,2011(5) :21 -24.
Jia Zhiqing. The Method Research of Anti - uplift Design for Open Cut Tunnel[ J]. Railway Construction Technology, 2011(5) :21 -24.
|
|
|
|