Abstract Research purposes:The Chongqing - Guizhou railway is a line for the mixed passenger and freight traffic, and is an important part of the convenient,rapid,large capacity channel from the Sichuan,Chongqing and the northwest area to the Guizhou, Guangxi, Hainan, Guangdong areas. The line needs to access into the Guiyang hub in the northern city and the passenger train of the railway accesses into the Guiyang Bei Station. But where does the freight train access into the Guiyang hub is the urgent problem to be solved because it relates to the disturbance level to the city planing and the construction investment. This paper compares and analyzes the two optional plans of accessing the freight train into the Dulaying Station via connecting line and accessing the fright train into the existing Sichuang - Guiyang Railway via connecting line to determine the more reasonable plan.
Research conclusions:From the analysis of the line direction of the Chongqing - Guiyang Railway after it accessing into the Guiyang hub,it is concluded : ( 1) The plan for the freight train of the Chongqing - Guiyang Railway accessing into the Guiyang hub should consider the demands of the upgrading of the existing railway line to reduce the abandon projects in long — term future. (2) The plan for the fright train accessing into the existing Sichuang - Guiyang Railway via connecting line can save the construction investment and has a good coordinations with the projects in the near future and long - term future. (3) This research can provide the reference to the similar works.
|
Received: 29 December 2012
|
|
|
|
|
[1] GB 50090-2006,铁路线路设计规范[S]
GB 50090—2006,Code for Design of Railway [ S].
[2]GB 50091 —2006,铁路车站及枢纽设计规范[S]
GB 50091-2006,Code for Design of Railway Station and Terminal [S].
[3]铁建设[2007]47号,新建时速300?350公里客运专线 铁路设计暂行规定[S].
Railway Construction [ 2007 ] No. 47,The Temporary Regulations for the Designs of the Passenger Dedicated Railway with a Speed of 300 km/h to 350 km/h [S]
[4]铁道第四勘察设计院。铁路工程设计技术手册?站场及 枢纽[K].北京:中国铁道出版社,2004.
The Fourth Survey and Design Institute of China Railways. Railway Engineering Technical Manual - Station and Yard and Terminal [ K ]. China Railway Publishing House,2004.
[5]杨丽华.新建贵广铁路引入都匀地区方案研究[J].铁道 运输与经济,2009(5) :30-32.
Yang Lihua. Study on Leading — in Scheme for Newly 一 built GuiGuang Railway in Duyun Area [ J ]. Railway Transport and Econnmy ,2009 (5):30 - 32.
[6]包维民.十字交叉型客运站布置图型研究[J].铁道运输 与经济,2007(S):31 -35.
Bao Weimin. Study on Layout of Criss - crossing Passenger Station [ J ]. Railway Transport and Economy ,2007(S):31 -35.
[7]刘世峰.铁路接轨站设计应考虑的因素[J].铁道运输与经济,2007(5):58 -60.
Liu Shifeng. Factors to Be Considered in Design of Railway Junction Sration [ J]. Railway Transport and Economy, 2007(S) :58 - 60.
[8]刘军强.敦煌车站站场设计研究[J].铁道运输与经济, 2007(S):83 -85.
Liu Junqiang. Study on Design of Dunhuang Stantion and Yard[ J], Raiyway Taransport and Economy,2007 (S):83-85.
[9]黄富强.南京站站场改造工程建设方案的分析与思考 [J ].上海铁道科技,2005 (6): 9-10.
Huang Fuqiang. Analysis and Thoughts on Constrution Plan of Nanjing Station and Yard Upgrading Engineering [ J ]? Shanghai Raiyway Science &TechnoIogy, 2005(6):9 -10.
[10]中铁二院工程集团有限责任公司,改建铁路重庆至贵阳 线初步设计[R].成都:中铁二院工程集团有限责任公司,20012.
China Railway Eryuan engineering Group Co. Ltd. Feasibility Preliminary on Newly - built Chongqing - Guiyang Railway [R]. Chengdu : China Railway Eryuan engineering Group Co. Ltd,2012.
[11]金武.浅谈蚌埠站站场改造施工方案[J].上海铁道科 技,2005(3) :31 -32.
Jin Wu. Discussion on Construction Plan fou Station and Yard Upgrading in Benbu Station [ J ] . Shanghai Raiyway Science &Technology, 2005(3) :31 -32.
[12]韩长生.贵广快速铁路贺州站平面布置方案研究[J].铁 道工程学报,2010(2) :89-92.
Study on the Plane Layout of Hezhou Railway Station of Guizhou - Guangzhou Rapid 一 speed Railway [ J ] . Journal of Railway Engineering Society,2010(2) :89 - 92.
|
|
|
|