|
|
Research on Upgrading of Baiyinhua - Jinzhou Railway Corridor |
WANG Hai - tao |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China |
|
|
Abstract Research purposes: The Baiyinhua - Jinzhou Port railway corridor includes the Chifeng - Daban - Baiyinhua Railway and Jinzhou - Chifeng Railway,connecting the Baiyinhua coal mine and the coal dock of the Jinzhou port. This corridor is an important channel for coal transportion between railway and shipping in the east Inner Mongolia Autonomous Region,and it is also the important traffic route for supplying the coal to the power plant along the corridor. The existing Baiyinhua - Jinzhou Railway is single - track railway with small transport capacity,and can not meet the predicted transport demand. So it is necessary to upgrade this railway. The Baiyinhua - Jinzhou Railway is invested by the China Power with implement of the upgrading scheme step by step due to the investment step by step.
Research conclusions: Based on the comparison of the different upgrading schemes of adopting the different types of coaches and laying single line or double line for this corridor,it is decided to adopt the scheme of upgrade the section step by step. The scheme of upgrade double line step by step is adopted for the section between Baiyinhua and Chifeng along with expanding the effective length of the arrival and departure lines in station to 1 050 m. The scheme of grading single line step by step is adopted for the section between Chifeng and inzhou. The grading of the whole line is conducted step by step and section by section. In this way,the annual investment is relatively even,and it is suitable for the enterprise's investment.
|
Received: 03 February 2012
|
|
|
|
|
[1] GB 50091—2006,铁路车站及地区设计规范[S].
GB 50091—2006,Code for Design of Railway Station and Terminal[S].
[2] 胡思继. 铁路行车组织[M]. 北京: 中国铁道出版社, 2002.
Hu SIji. Railway Traffic Organization[M]. Bejing: China Railway Publishing House,2002.
[3] 杨浩,等. 铁路运输组织学[M]. 北京: 中国铁道出版社, 2005.
Yang Hao,etc. Railway Transport Organization[M]. Bejing: China Railway Publishing House,2005.
[4] 王海涛,曾祥根. 白音华至锦州媒运通道扩能规划研究报告[R]. 天津: 铁道第三勘察设计院集团有限公司, 2011.
Wang Haitao,Zeng Xianggen. Study Report about Capacity Expansion of Bai Yinhua to the JinZhou port railway[R]. Tianjin: The Third Railway Survey & Design Institute Group Corporation,2011.
[5] 周世林. 浅谈既有线扩能提速改造方案[J]. 铁道工程学报, 2010( 10) : 41 - 44.
Zhou Shilin. Discussion on Upgrading Scheme of Existing Railway Line [J ]. Journal of Railway Engineering Society, 2010( 10) : 41 - 44.
[6] 黄波. 黔桂线扩能改造工程主要技术标准研究[J]. 铁道工程学报, 2010( 8) : 1 - 6.
Huang Bo. Research on Main Technical Standard for Upgrading of Guizhou - Guangxi Railway[J]. Journal of Railway Engineering Society, 2010( 8) : 1 - 6.
[7] 赵鹏,张进川. 基于组合列车的重载铁路装车区车流组织优化模型研究[J]. 中国铁道科学, 2010( 6) : 116 - 121.
Zhao Peng,Zhang Jinchuan. Study on the Optimization Model of Car Flow Organization in the Loading Area of Heavy Haul Railway Based on the Combined Trains [J]. China Railway Science,2010( 6) : 116 - 121.
[8] 郭锴. 新建双线铁路的车站分布研究[J]. 铁道运输与经济, 2009( 1) : 91 - 92.
Guo Kai. The New Railway Station Distribution Research[J]. Railway Transport and Economy,2009 ( 1) : 91 - 92.
[9] 刘华. 铁路车站分布与能力适应性分析[J]. 中国铁路, 2006( 8) : 61 - 63.
Liu Hua. Railway Station Distribution and Adaptability Analysis[J]. China Railways, 2006( 8) : 61 - 63.
[10] 杨元明. 既有铁路扩能改造若干问题的探讨[J]. 铁道工程学报, 2010( 12) : 1 - 6.
Yang Yuanming. Discussion on Problems in Upgrading of Existing Railway Line [J]. Journal of Railway Engineering Society, 2010( 1) : 1 - 6.
[11] 李煜珍. 湛江港口铁路扩能研究[J]. 铁道建筑,2004 ( 6) : 62 - 64.
Li Yuzhen. Zhanjiang Port Railway Research [J]. Railway Engineering, 2004( 6) : 62 - 64.
|
|
|
|