Lei Zhonglin. Research on Calculations of UIC Gauge Code and Its Relative Issues [J]. Journal of Railway Engineering Society, 2011( 8) : 121 - 125.
[3] UIC—IF—7 /96,高速铁路线养护维修[S].
UIC—IF—7 /96,Maintenance of High Speed Lines[S].
[4] UIC—720,无缝线路养护维修[S].
UIC—720,Laying and Maintenance of CWR Track [S].
[5] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009,High Speed Railway Design Standards [S].
[6] 铁运[2009]36 号,关于客运专线固定设施维修管理有关问题的指导意见[S].
Railway Transportation[2009]No. 36,Directive Options on Maintenance of Fixed Installation of Passengers only Railway[S].
[7] 崔艳萍. 我国客运专线基础设施养护维修体制模式研究[J]. 铁路运输与经济, 2008( 10) : 89 - 91.
Cui Yanping. Study on the Modes of PDL Infrastructure Maintenance and Repair System [J]. Railway Transportation and Economy,2008( 10) : 89 - 91.