CONTROLLED BLASTING ADOPTED ON RECONSTRUCTING SECOND LINE OF BAOJI-CHENGDU RAILWAY

Xie Tiaiji

Journal of Railway Engineering Society ›› 1995, Vol. 12 ›› Issue (2) : 74-79.

PDF(349 KB)
PDF(349 KB)
Journal of Railway Engineering Society ›› 1995, Vol. 12 ›› Issue (2) : 74-79.

CONTROLLED BLASTING ADOPTED ON RECONSTRUCTING SECOND LINE OF BAOJI-CHENGDU RAILWAY

  • Xie Tiaiji
Author information +
History +

Abstract

Based on the engineering characteristics and the geological conditions of the Baoji- Chengdu double-track railway line,this paper gives the discussions on the engineering organi?zations and the technological processes of the controlled blasting. A set of working methods have been established for drilling holes, putting in explosives, plugging up and firing. The method for blasting an insolated big rock has been also proposed.

Key words

second line of Baoji-Chengdu Railway / controlled blasting

Cite this article

Download Citations
Xie Tiaiji. CONTROLLED BLASTING ADOPTED ON RECONSTRUCTING SECOND LINE OF BAOJI-CHENGDU RAILWAY[J]. Journal of Railway Engineering Society, 1995, 12(2): 74-79
PDF(349 KB)

2608

Accesses

0

Citation

Detail

Sections
Recommended

/